enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Capacity utilization - Wikipedia

    en.wikipedia.org/wiki/Capacity_utilization

    Capacity utilization or capacity utilisation is the extent to which a firm or nation employs its installed productive capacity (maximum output of a firm or nation). It is the relationship between output that is produced with the installed equipment, and the potential output which could be produced with it, if capacity was fully used. [1]

  3. Capacity factor - Wikipedia

    en.wikipedia.org/wiki/Capacity_factor

    At the low range of capacity factors is the photovoltaic power station, which supplies power to the electricity grid from a large-scale photovoltaic system (PV system). An inherent limit to its capacity factor comes from its requirement of daylight, preferably with a sun unobstructed by clouds, smoke or smog, shade from trees and building ...

  4. Intersection capacity utilization - Wikipedia

    en.wikipedia.org/wiki/Intersection_Capacity...

    Synchro 5.0, the LOS analysis software, also calculates Intersection Capacity Utilization (ICU) which provides additional insight as to how well an intersection is functioning and how much extra capacity is available to handle future growth, traffic fluctuation and incidents. The ICU calculation does not use existing signal timings or sign control.

  5. Capacity planning - Wikipedia

    en.wikipedia.org/wiki/Capacity_planning

    Capacity planning is the process of determining ... Better utilization of existing capacity can be accomplished through ... To calculate the total capacity available ...

  6. Overall equipment effectiveness - Wikipedia

    en.wikipedia.org/wiki/Overall_equipment...

    Calculation: Performance (Productivity) = (Parts Produced * Ideal Cycle Time) / Operating time [7] Example: A given Work Center is scheduled to run for an 8-hour (480-minute) shift with a 30-minute scheduled break.

  7. Utilization factor - Wikipedia

    en.wikipedia.org/wiki/Utilization_factor

    In electrical engineering, utilization factor, , is the ratio of the maximum load which could be drawn to the rated capacity of the system. This is closely related to the concept of Load factor. The Load factor is the ratio of the load that a piece of equipment actually draws (time averaged) when it is in operation to the load it could draw ...

  8. Passenger load factor - Wikipedia

    en.wikipedia.org/wiki/Passenger_load_factor

    Passenger Capacity of different Transport Modes Road Space Requirements. Passenger load factor, or load factor, measures the capacity utilization of public transport services like airlines, passenger railways, and intercity bus services. It is generally used to assess how efficiently a transport provider fills seats and generates fare revenue.

  9. Load duration curve - Wikipedia

    en.wikipedia.org/wiki/Load_duration_curve

    The LDC curve shows the capacity utilization requirements for each increment of load. The height of each slice is a measure of capacity, and the width of each slice is a measure of the utilization rate or capacity factor. The product of the two is a measure of electrical energy (e.g. kilowatthours).