enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Underground hard-rock mining - Wikipedia

    en.wikipedia.org/wiki/Underground_hard-rock_mining

    There are two principal phases of underground mining: development mining and production mining. Development mining is composed of excavation almost entirely in (non-valuable) waste rock in order to gain access to the orebody. There are six steps in development mining: remove previously blasted material (muck out round), scaling (removing any unstable slabs of rock hanging from the roof and ...

  3. Raise borer - Wikipedia

    en.wikipedia.org/wiki/Raise_borer

    A raise borer is a machine used in underground mining, to excavate a circular hole between two levels of a mine without the use of explosives. The raise borer is set up on the upper level of the two levels to be connected, on an evenly laid platform (typically a concrete pad).

  4. Drilling jumbo - Wikipedia

    en.wikipedia.org/wiki/Drilling_jumbo

    A drilling jumbo consists of one, two or three rock drill carriages, sometimes a platform, which the miner stands on to load the holes with explosives, clear the face of the tunnel or do something else. [further explanation needed] The carriages are bolted onto the chassis, which supports the miner's cabin as well as the engine. Although modern ...

  5. Drilling rig - Wikipedia

    en.wikipedia.org/wiki/Drilling_rig

    Mining drilling rigs are used for two main purposes, exploration drilling which aims to identify the location and quality of a mineral, and production drilling, used in the production-cycle for mining. Drilling rigs used for rock blasting for surface mines vary in size dependent on the size of the hole desired, and is typically classified into ...

  6. Subterrene - Wikipedia

    en.wikipedia.org/wiki/Subterrene

    The front of the machine is equipped with a stationary drill tip which is kept at 700–930 °C (1,300–1,700 °F). The molten rock is pushed around the edges as the vehicle is forced forward, and cools to a glass-like lining of the tunnel. Massive amounts of energy are required to heat the drill head, supplied via nuclear power or electricity.

  7. Drifter drill - Wikipedia

    en.wikipedia.org/wiki/Drifter_drill

    Rock drill mounted on a tripod. The large objects on the legs are weights to anchor it down into position. In reciprocating power drills, the drilling cylinder is mounted on a feed-screw, such that as the hole is drilled and the drilling point recedes from the rock face, the drill-bit continues to move into it, while the anchor point (on the tripod or column) remains in place. [11]

  8. Boring (earth) - Wikipedia

    en.wikipedia.org/wiki/Boring_(earth)

    Boring is drilling a hole, tunnel, or well in the Earth. It is used for various applications in geology, agriculture, hydrology, civil engineering, and mineral exploration. Today, most Earth drilling serves one of the following purposes: return samples of the soil and/or rock through which the drill passes; access rocks from which material can ...

  9. Mining machinery engineering - Wikipedia

    en.wikipedia.org/wiki/Mining_machinery_engineering

    A similar development took place in the development of underground machinery. Drilling and blasting replaced manual cutting of ores. Lately, the use of continuous mining machines has become the order of the day to comply with environmental regulations, protect surface features, and also achieve an increased production rate. As the concern for ...