Marcus's method is a structural analysis used in the design of reinforced concrete slabs. The method was developed by Henri Marcus and described in 1938 in Die Theorie elastischer Gewebe und ihre Anwendung auf die Berechnung biegsamer Platten . [ 1 ]
A common example is polyethylene sheeting laid under a concrete slab to prevent the concrete from gaining moisture through capillary action. [5] A DPM may be used for the DPC. Integral damp proofing in concrete involves adding materials to the concrete mix to make the concrete itself impermeable. [4]
The dampness results in vaporization where water vapor is transmitted into the building's interiors. Water vapor may enter the building through supply air ducts in building slabs and circulated by warm forced air. Water vapor can also enter a building through leaky return air ducts in homes with crawlspaces. [4]: 185–187
From the late 1990s to the 2010s, the construction industry has had technological advances in waterproofing materials, including integral waterproofing systems and more advanced membrane materials. Integral systems such as hycrete work within the matrix of a concrete structure, giving the concrete itself a waterproof quality. There are two main ...
A concrete slab is a common structural element of modern buildings, consisting of a flat, horizontal surface made of cast concrete. Steel- reinforced slabs, typically between 100 and 500 mm thick, are most often used to construct floors and ceilings, while thinner mud slabs may be used for exterior paving ( see below ).
In practice, creep during drying is inseparable from shrinkage. The rate of creep increases with the rate of change of pore humidity (i.e., relative vapor pressure in the pores). For small specimen thickness, the creep during drying greatly exceeds the sum of the drying shrinkage at no load and the creep of a loaded sealed specimen (Fig. 1 bottom).
Using milling instead of other methods, such as rolling them in, means that the rumble strips can be added at any time after the road surface has hardened. [8] Another example is to modify the roto-milling head to create slots in concrete slabs for the dowel bar retrofit process. The typical process is to saw cut and jackhammer out the slots ...
It must allow the architecture to work, and the building services to fit within the building and function (air conditioning, ventilation, smoke extract, electrics, lighting, etc.). The structural design of a modern building can be extremely complex and often requires a large team to complete. Structural engineering specialties for buildings ...