The first of the cooling load factors used in this method is the CLTD, or the Cooling Load Temperature Difference. This factor is used to represent the temperature difference between indoor and outdoor air with the inclusion of the heating effects of solar radiation. [1] [5] The second factor is the CLF, or the cooling load factor.
The use of g units refers to the fact that an observer on board an aircraft will experience an apparent acceleration of gravity (i.e. relative to their frame of reference) equal to load factor times the acceleration of gravity. For example, an observer on board an aircraft performing a turn with a load factor of 2 (i.e. a 2 g turn) will see ...
A bill of quantities is a document used in tendering in the construction industry in which materials, parts, and labor (and their costs) are itemized.It also (ideally) details the terms and conditions of the construction or repair contract and itemizes all work to enable a contractor to price the work for which he or she is bidding.
Utilization factor (solid line) with blade-to-gas speed ratio. The utilization factor or use factor is the ratio of the time that a piece of equipment is in use to the total time that it could be in use. It is often averaged over time in the definition such that the ratio becomes the amount of energy used divided by the maximum possible to be used.
A Allocation of costs is the transfer of costs from one cost item to one or more other cost items. Allowance - a value in an estimate to cover the cost of known but not yet fully defined work. As-sold estimate - the estimate which matches the agreed items and price for the project scope. B Basis of estimate (BOE) - a document which describes the scope basis, pricing basis, methods ...
This COBie MVD, produced under contract to the Construction Engineering Research Lab, was created by the buildingSMART international Model View Definition support group, and was based on IFC 4. [9] The main standard contains the project's Information Delivery Manual and Model View Definition as well as business case and implementation resources.
In electrical engineering the load factor is defined as the average load divided by the peak load in a specified time period. [1] It is a measure of the utilization rate, or efficiency of electrical energy usage; a high load factor indicates that load is using the electric system more efficiently, whereas consumers or generators that underutilize the electric distribution will have a low load ...
A structural load or structural action is a mechanical load (more generally a force) applied to structural elements. [1] [2] A load causes stress, deformation, displacement or acceleration in a structure. Structural analysis, a discipline in engineering, analyzes the effects of loads on structures and structural elements.