Search results
Results from the WOW.Com Content Network
If required, the upper part of the well can be reamed and cased with larger diameter pipe (3 or 5 inches), to accommodate larger pumps. A shallow (large diameter) rope pump, for example, may require a wider well and submersible pumps commonly need at least 4". Note that there is no need to enlarge the entire depth of the borehole: reaming until ...
Well documented examples are the Rota-sludge, Baptist and some variants of the EMAS drilling methods. Perhaps the simplest and cheapest of them all is the Baptist well drilling method, which uses lightweight and cheap PVC pipe for most of the drill stem and in which the drill bit doubles as a foot valve. Wells over 100 metres deep have been ...
When the well has been drilled, it is completed to provide an interface with the reservoir rock and a tubular conduit for the well fluids. The surface pressure control is provided by a Christmas tree , which is installed on top of the wellhead, with isolation valves and choke equipment to control the flow of well fluids during production.
On the up stroke of the piston the foot valve opens and suction brings water into the pump head. On the following down stroke of the piston the valve on the piston opens up and allows water to flow above the piston. On the successive up stroke of the piston water is pushed out of the outlet. A rural handpump in Belgium.
A check valve, non-return valve, reflux valve, retention valve, foot valve, or one-way valve is a valve that normally allows fluid (liquid or gas) to flow through it in only one direction. [1] Check valves are two-port valves, meaning they have two openings in the body, one for fluid to enter and the other for fluid to leave. There are various ...
The tremie concrete placement method uses a vertical or nearly vertical pipe, through which concrete is placed by gravity feed below water level. [4]The lower end of the pipe is kept immersed in fresh concrete so that concrete rising from the bottom displaces the water above it, thus limiting washing out of the cement content of the fresh concrete at the exposed upper surface.
A blowout preventer (BOP) (pronounced B-O-P) [1] is a specialized valve or similar mechanical device, used to seal, control and monitor oil and gas wells to prevent blowouts, the uncontrolled release of crude oil or natural gas from a well. They are usually installed in stacks of other valves.
Gas lift well: gas is fed into valves installed in mandrels in the tubing strip. The hydrostatic head is lowered and the fluid is gas lifted to the surface. Single-well alternate completions: in this instance there is a well with two zones. In order to produce from both the zones are isolated with packers.