Search results
Results from the WOW.Com Content Network
Pipe bursting is a trenchless method of replacing buried pipelines (such as sewer, water, or natural gas pipes) without the need for a traditional construction trench. "Launching and receiving pits" replace the trench needed by conventional pipe-laying.
It is a jointless, seamless pipe lining within an existing pipe. As one of the most widely used rehabilitation methods, CIPP has applications in sewer, water, gas, chemical and district heating pipelines ranging in diameter from 0.1 to 2.8 meters (2–110 inches).
Pipe replacement by pipe bursting. Trenchless rehabilitation includes such construction methods as spiral wound lining, sliplining, thermoformed pipe, pipe bursting, shotcrete, gunite, cured-in-place pipe (CIPP), grout-in-place pipe, mechanical spot repair, and other methods for the repair, rehabilitation, or replacement of existing buried pipes and structures without excavation, or at least ...
A slip coupling (sometimes also called a repair coupling) is deliberately made without this internal stop to allow it to be slipped into place in tight locations, such as the repair of a pipe that has a small leak due to corrosion or freeze bursting, or which had to be cut temporarily for some reason. Since the alignment stop is missing, it is ...
Pipe ramming (sometimes also called pipe jacking) is a trenchless method for installation of steel pipes and casings. Distances of 30 m (150 feet) or more and over 500 mm (20 inches) in diameter are common, although the method can be used for much longer and larger installations.
A hilarious TikTok video of Texas sisters banding together to fix a botched, stealth haircut before mom comes went viral and mom Gresia Zamarripa explained how it ended.
A rupture disc (burst) Pressure-effect acting at a rupture disc A rupture disc, also known as a pressure safety disc, burst disc, bursting disc, or burst diaphragm, is a non-reclosing pressure relief safety device that, in most uses, protects a pressure vessel, equipment or system from overpressurization or potentially damaging vacuum conditions.
The pipe in the tunnel has an inside diameter of 22 feet (6.7 m). [3] The East Side tunnel was the largest sewer construction project ever undertaken by the City of Portland. A contractor, Kiewit-Bilfinger Berger (KBB), used a tunnel boring machine that was 300 feet (91 m) long and had a cutting head that was 25 feet (7.6 m) in diameter. In ...