Search results
Results from the WOW.Com Content Network
Pipe bursting is a trenchless method of replacing buried pipelines (such as sewer, water, or natural gas pipes) without the need for a traditional construction trench. "Launching and receiving pits" replace the trench needed by conventional pipe-laying.
Delyno Brown (born August 5, 1981), [citation needed] [1] better known as Pressure or Pressure Busspipe, is a reggae musician from Saint Thomas, U.S. Virgin Islands. [2] He gained his early experience working on the Star Lion sound system in the late 1990s. [3] His debut album, The Pressure Is On, was produced by Dean Pond and released in 2005.
In engineering, the Moody chart or Moody diagram (also Stanton diagram) is a graph in non-dimensional form that relates the Darcy–Weisbach friction factor f D, Reynolds number Re, and surface roughness for fully developed flow in a circular pipe. It can be used to predict pressure drop or flow rate down such a pipe.
Well control is the technique used in oil and gas operations such as drilling, well workover and well completion for maintaining the hydrostatic pressure and formation pressure to prevent the influx of formation fluids into the wellbore.
The pipes were hollowed-out logs which were tapered at the end with a small hole in which the water would pass through. [23] The multiple pipes were then sealed together with hot animal fat. Wooden pipes were used in Philadelphia, [24] Boston, and Montreal in the 1800s. Built-up wooden tubes were widely used in the US during the 20th century.
Since the days of ancient Rome, the concept of communicating vessels has been used for indoor plumbing, via aquifers and lead pipes. Water will reach the same level in all parts of the system, which acts as communicating vessels, regardless of what the lowest point is of the pipes – although in practical terms the lowest point of the system depends on the ability of the plumbing to withstand ...
Process piping and power piping are typically checked by pipe stress engineers to verify that the routing, nozzle loads, hangers, and supports are properly placed and selected such that allowable pipe stress is not exceeded under different loads such as sustained loads, operating loads, pressure testing loads, etc., as stipulated by the ASME B31, EN 13480, GOST 32388, RD 10-249 or any other ...
Pipe is usually delivered to a customer or jobsite as either "sticks" or lengths of pipe (typically 20 feet (6.1 m), called single random length) or they are prefabricated with elbows, tees and valves into a prefabricated pipe spool [A pipe spool is a piece of pre-assembled pipe and fittings, usually prepared in a shop so that installation on ...