Singrauli Super Thermal Power Plant is located at Shaktinagar in Sonebhadra district in Indian state of Uttar Pradesh. [1] The power plant is the first power plant of NTPC . [ 2 ] [ 3 ] It sources coal from Jayant and Bina mines and water from Rihand Reservoir.
Shaktinagar Railway Station is fully connected by road to various cities through NH 39 ( Former NH 75), SH 5A and is also connected directly via Trains like: Triveni Express (Tanakpur To Shaktinagar), Singrauli - Varanasi Intercity (Singrauli to Varanasi), Singrauli - Jabalpur Intercity (Singrauli to Jabalpur) and Shaktinagar Passenger (Shaktinagar to Chopan), Shaktipunj Express (Jabalpur ...
Anpara Thermal Power Station is located at Anpara in Sonbhadra district in the Indian state of Uttar Pradesh, about 180 km (110 mi) from Varanasi on the Varanasi - Shakti Nagar route. It has a total power-generation capacity of 3850 MW using 9 units.
NSPCL [2] [3] (NTPC-SAIL Power Company Limited) is a joint venture of National Thermal Power Corporation [4] and Steel Authority of India Limited. [5] engaged in power generation primarily to meet the captive power requirement of various steel plants of SAIL throughout India. [6]
The power plant is one of the coal based power plants of NTPC Limited. [2] In the year 1992, Uttar Pradesh State Electricity Board (U.P.S.E.B.) transferred Unchahar Thermal Power Station to NTPC Limited against payment overdue and later on renamed it to Feroze Gandhi Unchahar Thermal Power Plant by NTPC Limited.
The Vindhyachal Thermal Power Station is located in Singrauli district in the Indian state of Madhya Pradesh.One of the coal-fired power stations of NTPC, it is the largest power station in India, and the 10th largest coal-fired power station in the world, with an installed capacity of 4,760 MW with total of 4783 MW. [1]
NTPC Limited was contracted to handle erection and commissioning for the project. Contracts for the Boiler Turbine Generator (BTG) and the Balance of Plant (BOP) were granted to Bharat Heavy Electricals Limited and McNally Bharat Engineering Company Limited, Kolkata, respectively.
The project was originally proposed in 1999 but got delayed because Coal India Limited objected to the location of the power plant and wanted NTPC to relocate the power plant as it was coming up on site having 6 billion tonnes of coal underneath it. Coal India Limited withdrew the coal linkage to the plant in 2008.