Search results
Results from the WOW.Com Content Network
An excavation lake (also a flooded gravel pit) is an artificial lake, which usually has its origins in the excavation of gravel or sand for construction materials or in some other kind of surface mining. In many cases, the excavation holes are landscaped according to the land restoration required by law.
Excavation may be classified by type of material: [1]: 13.1 Topsoil excavation; Earth excavation; Rock excavation; Muck excavation – this usually contains excess water and unsuitable soil; Unclassified excavation – this is any combination of material types; Excavation may be classified by the purpose: [1]: 13.1, 13.2
Excavators are heavy construction equipment primarily consisting of a boom, dipper (or stick), bucket, and cab on a rotating platform known as the "house". [ 1 ] The modern excavator's house sits atop an undercarriage with tracks or wheels , being an evolution of the steam shovel (which itself evolved into the power shovel when steam was ...
In construction, trenches are dug for foundations of buildings, retaining walls and dams, and for cut-and-cover construction of tunnels. In archaeology, the "trench method" is used for searching and excavating ancient ruins or to dig into strata of sedimented material.
A crawler excavator, also known as a track-type excavator or tracked excavator, is a type of heavy construction equipment primarily used for excavation and earthmoving tasks. It is characterized by its tracked undercarriage, which provides superior mobility and traction compared to wheeled excavators, especially in soft, uneven, or unstable ...
Excavation of Olive Mount cutting, Liverpool. Watercolour by T.T.Bury (1833) The cutting was 20 ft (6.1 m) wide and 70 ft (21.3 m) deep. Construction required the removal of 480,000 cubic yards (370,000 m 3) of sandstone. Olive Mount cutting, Liverpool, England; Talerddig cutting, Wales
Tunnel Construction. Tunnels are dug in types of materials varying from soft clay to hard rock. The method of tunnel construction depends on such factors as the ground conditions, the ground water conditions, the length and diameter of the tunnel drive, the depth of the tunnel, the logistics of supporting the tunnel excavation, the final use and shape of the tunnel and appropriate risk management.
Incremental excavation supported by shotcrete, rock bolts, cable anchors and steel sets or ribs; Shafts can be sunk either dry or for methods such as the caisson method they can be sunk wet. Sinking a dry shaft means that any water that flows into the excavation is pumped out to leave no significant standing or flowing water in the base of the ...