enow.com Web Search

  1. Ads

    related to: pouring concrete at an angle

Search results

  1. Results from the WOW.Com Content Network
  2. Tremie - Wikipedia

    en.wikipedia.org/wiki/Tremie

    The tremie concrete placement method uses a vertical or nearly vertical pipe, through which concrete is placed by gravity feed below water level. [4]The lower end of the pipe is kept immersed in fresh concrete so that concrete rising from the bottom displaces the water above it, thus limiting washing out of the cement content of the fresh concrete at the exposed upper surface.

  3. List of construction methods - Wikipedia

    en.wikipedia.org/wiki/List_of_Construction_methods

    Concrete is a mix of cement and water plus an aggregate such as sand or stone. Its compression strength means it can support heavy weights. [5] Insulating concrete forms (ICFs) cam be used for home construction. They are made by pouring concrete between rigid panels, often made out of polystyrene foam. Rebar can provide additional strength ...

  4. Slip forming - Wikipedia

    en.wikipedia.org/wiki/Slip_forming

    The first residential building of slipform construction; erected in 1950 in Västertorp, Sweden, by AB Bygging Later picture of the residential building in Västertorp. Slip forming, continuous poured, continuously formed, or slipform construction is a construction method in which concrete is placed into a form that may be in continuous motion horizontally, or incrementally raised vertically.

  5. Concrete slab - Wikipedia

    en.wikipedia.org/wiki/Concrete_slab

    After the concrete has set the wood may be removed. Formwork can also be permanent, and remain in situ post concrete pour. For large slabs or paths that are poured in sections, this permanent formwork can then also act as isolation joints within concrete slabs to reduce the potential for cracking due to concrete expansion or movement.

  6. Waffle slab - Wikipedia

    en.wikipedia.org/wiki/Waffle_slab

    First the supports are built, then the pods are arranged in place, and finally the concrete is poured. This process may occur in three different approaches, however the basic method is the same in each: In situ: Formwork construction and pouring of concrete occur on site, then the slab is assembled (if required). [4]

  7. Prefabrication - Wikipedia

    en.wikipedia.org/wiki/Prefabrication

    Pouring concrete sections in a factory brings the advantages of being able to re-use moulds and the concrete can be mixed on the spot without having to be transported to and pumped wet on a congested construction site. Prefabricating steel sections reduces on-site cutting and welding costs as well as the associated hazards.

  1. Ads

    related to: pouring concrete at an angle