Rebar detailing is the discipline of preparing 'shop/placing' or 'fabrication' drawings or shop drawings of steel reinforcement for construction. Engineers prepare 'design drawings' that develop required strengths by applying rebar size, spacing, location, and lap of steel .
A cantilever in a traditionally timber framed building is called a jetty or forebay. In the southern United States, a historic barn type is the cantilever barn of log construction. Temporary cantilevers are often used in construction. The partially constructed structure creates a cantilever, but the completed structure does not act as a cantilever.
The cantilever method is an approximate method for calculating shear forces and moments developed in beams and columns of a frame or structure due to lateral loads. The applied lateral loads typically include wind loads and earthquake loads, which must be taken into consideration while designing buildings.
The shop drawing is the manufacturer’s or the contractor’s drawn version of information shown in the construction documents. [1] The shop drawing normally shows more detail than the construction documents.
A structural drawing, a type of engineering drawing, is a plan or set of plans and details for how a building or other structure will be built.Structural drawings are generally prepared by registered professional engineers, and based on information provided by architectural drawings.
A basement wall is thus one kind of retaining wall; however, the term usually refers to a cantilever retaining wall, which is a freestanding structure without lateral support at its top. [2] These are cantilevered from a footing and rise above the grade on one side to retain a higher level grade on the opposite side.
A cantilever bridge is a bridge built using structures that project horizontally into space, supported on only one end (called cantilevers). For small footbridges , the cantilevers may be simple beams ; however, large cantilever bridges designed to handle road or rail traffic use trusses built from structural steel , or box girders built from ...
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...