Search results
Results from the WOW.Com Content Network
Section through railway track and foundation showing the sub-grade. Grading in civil engineering and landscape architectural construction is the work of ensuring a level base, or one with a specified slope, [1] for a construction work such as a foundation, the base course for a road or a railway, or landscape and garden improvements, or surface drainage.
A basement wall is thus one kind of retaining wall; however, the term usually refers to a cantilever retaining wall, which is a freestanding structure without lateral support at its top. [2] These are cantilevered from a footing and rise above the grade on one side to retain a higher level grade on the opposite side.
The pressure exerted by soil against the wall is referred to as active pressure. The resistance offered by the soil to an object pushing against it is referred to as "passive pressure". Rankine's theory is applicable to incompressible soils. The equation for cohesionless active earth pressure is expressed as: = where:
The wall face is often of precast, segmental blocks, panels or geocells that can tolerate some differential movement. The walls are infilled with granular soil, with or without reinforcement, while retaining the backfill soil. Reinforced walls utilize horizontal layers typically of geogrids. The reinforced soil mass, along with the facing ...
It is of sufficiently high resolution to allow quality print reproduction. Still images should be a minimum of 1500 pixels in width and height (1500×1500px); larger sizes are generally preferred. The size of animated images is judged less strictly, though larger is still preferred. Further information on image size can be found here.
Grade beam. A grade beam or grade beam footing is a component of a building's foundation. It consists of a reinforced concrete beam that transmits the load from a bearing wall into spaced foundations such as pile caps or caissons. [1] It is used in conditions where the surface soil's load-bearing capacity is less than the anticipated design loads.
Angle of repose of a heap of sand Sandpile from the Matemateca collection. The angle of repose, or critical angle of repose, [1] of a granular material is the steepest angle of descent or dip relative to the horizontal plane on which the material can be piled without slumping.
Once excavated, the walls are then power washed and allowed to dry. The dry walls are sealed with a waterproofing membrane, [3] and new drainage tiles (weeping tiles) are placed at the side of the footing. A French drain, PVC pipe, or other drainage system is installed and water is led further from the basement.