Search results
Results from the WOW.Com Content Network
Find answers to the latest online sudoku and crossword puzzles that were published in USA TODAY Network's local newspapers.
This can give information about the distribution of axles. For example, provide manufacturers the chassis configuration 8×4×4 to show that the vehicle has two steered front axles and two driven rear axles, compared to the chassis configuration 8×4/4 where the vehicle has one steered front axle, one steered rear axle (the fore axle) and two ...
Related to driving axles (minimum 2, "B"), indicates they are individually driven by separate traction motors. Numbers Consecutive non-driving axles, starting with 1 for a single axle. Prime symbol" ′ "The axles indicated by a single letter or number are mounted on a bogie. Parentheses Groups letters and numbers describing the same bogie.
Letters refer to powered axles, and numbers to unpowered (or idler) axles. "A" refers to one powered axle, "B" to two powered axles in a row, "C" to three powered axles in a row, and "D" to four powered axles in a row. "1" refers to one idler axle, and "2" to two idler axles in a row. A dash ("–") separates trucks or wheel assemblies.
The Dana 44 has a GAWR up to 3,500 lb (1,600 kg) and is a semi-floating type, having one bearing on the end of the axle shaft which carries the weight of the vehicle on the axle and also allows axle rotation. There is an 8.9" diameter Dana 44 ring and pinion that is very different from the standard Dana 44.
No. 1218 is the sole survivor of the Norfolk and Western's class A locomotives and the only surviving 2-6-6-4 steam locomotive in the world. While smaller than Union Pacific's famous and more numerous "Challenger" class of 4-6-6-4 locomotives, Norfolk and Western's design racked up unmatched records of performance in service.
The Dana/Spicer Model 80 is an automotive axle manufactured by Dana Holding Corporation and has been used in OEM heavy duty applications by Chevrolet, Dodge, and Ford.It can be identified by its straight axle tubes, 10 bolt asymmetrical cover, and a "80" cast into the housing.
Tendering for the locomotive procurement began in 1989. The specification included; a top speed of 160 km/h (100 mph); a terminal-to-terminal travel time of 33 minutes pulling a 2,100-tonne (2,067-long-ton; 2,315-short-ton) train; an axle load limit of 22.5 tonnes (22.1 long tons; 24.8 short tons); an operating temperature range between −10 °C (14 °F) and 45 °C (113 °F); [6] a loading ...