Search results
Results from the WOW.Com Content Network
The task of additional reactive power compensation (also known as voltage compensation) is assigned to compensating devices: [7] passive (either permanently connected or switched) sinks of reactive power (e.g., shunt reactors that are similar to transformers in construction, with a single winding and iron core [9]).
A unified power flow controller (UPFC) is an electrical device for providing fast-acting reactive power compensation on high-voltage electricity transmission networks. It uses a pair of three-phase controllable bridges to produce current that is injected into a transmission line using a series transformer. [ 1 ]
If this is the case, then the load banks used for testing require reactive power compensation. The ideal solution is a combination of both resistive and reactive elements in one load bank package. Resistive/reactive loads are able to mimic motor loads and electromagnetic devices within a power system, as well as provide purely resistive loads.
Due to the existence of leap years, some EFA-Decembers have six weeks (e.g. 2004 and 2009), a strong difference from the commonly used Gregorian calendar system, where February is the leap month. [3] The EFA day is composed of six blocks of 4 hours each. For each block, baseload products exist (i.e. WD 1/2/3/4/5/6 and WE 1/2/3/4/5/6).
Hindu calendars - Vikram Samvat: 2080–2081 - Shaka Samvat: 1945–1946 - Kali Yuga: 5124–5125: Holocene calendar: 12024: Igbo calendar: 1024–1025: Iranian calendar: 1402–1403: Islamic calendar: 1445–1446: Japanese calendar: Reiwa 6 (令和6年) Javanese calendar: 1957–1958: Juche calendar: 113: Julian calendar: Gregorian minus 13 ...
On light loads, the power drawn by induction motors has a large reactive component and the power factor has a low value. The added current flowing to supply reactive power creates additional losses in the power system. In an industrial plant, synchronous motors can be used to supply some of the reactive power required by induction motors.
In practice, the prime mover (a power source that drives the generator) is designed for less active power than the generator is capable of (due to the fact that in real life generator always has to deliver some reactive power [2]), so a prime mover limit (a vertical dashed line on the illustration) changes the constraints somewhat (in the ...
Print/export Download as PDF; ... 2023 (Wednesday) 2022 ... September 6 is the 249th day of the year (250th in leap years) in the Gregorian calendar; ...