Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
In situ: Formwork construction and pouring of concrete occur on site, then the slab is assembled (if required). [4] Precast: The slabs are made somewhere else and then brought to the site and assembled. [4] Pre-fabricated: The reinforcements are integrated into the slab while being manufactured, without needing to reinforce the assembly on site ...
Waffle slab foundations adhere to International Building Code requirements. By 2008, most states put into effect the changes adopted in the 2006 IBC and, in regards to foundations, the on-grade mat foundation has become a more attractive design because, as an engineered system, it already accommodates the 2008 design recommendations, and required no major modifications to bring it into compliance.
A corrugated slab is designed when the concrete is poured into a corrugated steel tray, more commonly called decking. This steel tray improves strength of the slab, and prevents the slab from bending under its own weight. The corrugations run in one direction only. A ribbed slab gives considerably more strength in one direction. This is ...
Diaphragms are usually constructed of plywood or oriented strand board in timber construction; metal deck or composite metal deck in steel construction; or a concrete slab in concrete construction. [1] The two primary types of the diaphragm are flexible and rigid. [1]
Animation depicting construction of multi-story building using aluminum handset formwork. Steel and plywood formwork for poured in place concrete foundation. Cast-in-place concrete or Cast-in-situ concrete is a technology of construction of buildings where walls and slabs of the buildings are cast at the site in formwork. [1]
The traditional slab formwork technique consists of supports out of lumber or young tree trunks, that support rows of stringers assembled roughly 3 to 6 feet or 1 to 2 metres apart, depending on thickness of slab. Between these stringers, joists are positioned roughly 12 inches (30 cm) apart, upon which boards or plywood are placed. The ...