Ads
related to: 3 bank marine onboard charger 4 bank meter main load
Search results
Results from the WOW.Com Content Network
Load Analysis and Monitoring; Three (3) Phase Management and Voltage Matching; Redundant Power Distribution; Frequency Control; Blackout Start; Selection of Generators Priority (first leading main, second and third stby generator in sequence) Equal Load Division between generators; Tripping of non-essential load groups (load shedding in two steps)
Since electrical energy is a form of energy that cannot be effectively stored in bulk, it must be generated, distributed, and consumed immediately. When the load on a system approaches the maximum generating capacity, network operators must either find additional supplies of energy or find ways to curtail the load, hence load management.
A load bank is a piece of electrical test equipment used to simulate an electrical load, to test an electric power source without connecting it to its normal operating load. [ 1 ] [ 2 ] During testing, adjustment, calibration, or verification procedures, a load bank is connected to the output of a power source, such as an electric generator ...
MACS3 Basic Loading Program is designed for all ship types (containership, tanker, Bulk carrier, general cargo, RoRo, Passenger ship) in accordance with the unified IACS Requirement L5 "Onboard Computers for Stability Calculations".
Because the main AC switchboard with its AC circuit breakers and protection relays is omitted from the new design, a new protection philosophy that fulfills class requirements is needed for selectivity and equipment protection. ABB has proposed a solution for protecting the DC distribution system using a combination of fuses and controlled turn ...
Electric energy has to be obtained for the battery bank from some source like the sun. A mains charger allows the boat to be charged from shore-side power when available. Shore-based power stations are subject to much stricter environmental controls than the average marine diesel or outboard motor.
For example, a switchboard for a bank of electrical generators, especially frequency would have control of AC power and load sharing, and instruments for frequency, voltage, current, and energy, with perhaps a synchroscope. A main switchboard is a large electrical switchboard that connects to the grid and distributes power to other smaller ...
The first German jet engines built during the Second World War used a mechanical APU starting system designed by the German engineer Norbert Riedel.It consisted of a 10 horsepower (7.5 kW) two-stroke flat engine, which for the Junkers Jumo 004 design was hidden in the engine nose cone, essentially functioning as a pioneering example of an auxiliary power unit for starting a jet engine.
Ads
related to: 3 bank marine onboard charger 4 bank meter main load