A bill of quantities is a document used in tendering in the construction industry in which materials, parts, and labor (and their costs) are itemized.It also (ideally) details the terms and conditions of the construction or repair contract and itemizes all work to enable a contractor to price the work for which he or she is bidding.
A Allocation of costs is the transfer of costs from one cost item to one or more other cost items. Allowance - a value in an estimate to cover the cost of known but not yet fully defined work. As-sold estimate - the estimate which matches the agreed items and price for the project scope. B Basis of estimate (BOE) - a document which describes the scope basis, pricing basis, methods ...
Sometimes contractors submit lower tenders to win the contract and win the work. Either the costs that the contractor incurs are greater than the price he is charging the client (as a consequence of a lower tender determining the contract sum), and thus is likely to go insolvent , or he will claim for "loss and/or expense" due to discrepancies ...
Under the JCT's Standard Building Contract, 2011 Edition, if there are changes to “Statutory Requirements” after the contract's base date, then the contractor must alter the scope of work to comply. The change will be deemed to be a variation for which the contractor is entitled to be paid, even if no formal instructions have been issued. [23]
Design–bid–build (or design/bid/build, and abbreviated D–B–B or D/B/B accordingly), also known as Design–tender (or "design/tender"), traditional method, or hardbid, is a project delivery method in which the agency or owner contracts with separate entities for the design and construction of a project.
A cost estimate is the approximation of the cost of a program, project, or operation.The cost estimate is the product of the cost estimating process. The cost estimate has a single total value and may have identifiable component values.
The Common Arrangement is the authoritative UK classification of work sections for building work, for use in arranging project specifications and bills of quantities. Over 300 work sections are defined in detail to give: good coordination between drawings, specifications and bills of quantities; predictability of location of relevant information
NEC Contracts logo. The New Engineering Contract (NEC), or NEC Engineering and Construction Contract, is a formalised system created by the UK Institution of Civil Engineers that guides the drafting of documents on civil engineering, construction and maintenance projects for the purpose of obtaining tenders, awarding and administering contracts.