enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Feroze Gandhi Unchahar Thermal Power Station - Wikipedia

    en.wikipedia.org/wiki/Feroze_Gandhi_Unchahar...

    Feroze Gandhi Unchahar Thermal Power Plant has an installed capacity of 1,550 megawatts (2,080,000 hp), inclusive of Fourth Stage, that got operational in April 2017. The First unit was commissioned in November 1988. The coal for the plant is derived from North Karanpura Coalfield. The water source is from Sarda Sahyak Canal. [3]

  3. List of power stations in South Africa - Wikipedia

    en.wikipedia.org/wiki/List_of_power_stations_in...

    [6] [7] In terms of share of GDP in 2012, South Africa was the 4th largest investor in renewable power in the world after Uruguay, Mauritius and Costa Rica. [8] The following is a list of electricity generating facilities within South Africa that are larger than 1 MW capacity.

  4. Vallur Thermal Power Station - Wikipedia

    en.wikipedia.org/wiki/Vallur_Thermal_Power_Station

    The power plant is operated by NTPC Tamil Nadu Energy Company Limited, a joint venture between NTPC Limited and TANGEDCO and has three units with 500 MW each. [1] In January 2014, the units in the power plant achieved a record generation of 24.09 million units (kWh [2]) of electricity.

  5. Sipat Thermal Power Station - Wikipedia

    en.wikipedia.org/wiki/Sipat_Thermal_Power_Station

    The power plant is one of the coal based power plants of NTPC. The coal for the power plant is sourced from Dipika Mines of South Eastern Coalfields Limited . The project has an installed capacity of 2980 MW consisting of two stages, stage one which got commissioned late was of 3 units of 660 MW each involving super-critical boilers technology ...

  6. Dr. Narla Tata Rao Thermal Power Station - Wikipedia

    en.wikipedia.org/wiki/Dr._Narla_Tata_Rao_Thermal...

    Dr Narla Tata Rao Thermal Power Plant is also known as Vijayawada Thermal Power Plant. It was developed under 4 stages, with the project cost of Rs 193 Crores and Rs 511 Crores respectively. Again with an investment of RS 840 Crores 2 units were commissioned under III Stage. The seventh unit of 500 MW was commissioned in 2009.

  7. Talcher Super Thermal Power Station - Wikipedia

    en.wikipedia.org/wiki/Talcher_Super_Thermal...

    Talcher Super Thermal Power Station or NTPC Talcher Kaniha located in Angul district of the Indian state of Odisha is the first mega power plant of India to have an installed generation capacity of 3000MW. The power plant is one of the coal-based power plants of NTPC.

  8. Kanti Thermal Power Station - Wikipedia

    en.wikipedia.org/wiki/Kanti_Thermal_Power_Station

    Installed capacity Date of commissioning Status Notes Stage-1: 1: 110: March 1985, recommissioned November 2013: Under dismantling: This unit went down in 2003 and then its renovation started by Bharat Heavy Electricals in April 2008 and was running at full capacity since November 2013 till 2022. Being old unit the same was decided to scrap ...

  9. Kudgi Super Thermal Power Station - Wikipedia

    en.wikipedia.org/wiki/Kudgi_Super_Thermal_Power...

    Kudgi Super Thermal Power Project will have an installed capacity of 4000 MW (3x800 MW in first stage and 2x800 MW in second stage). Doosan Power systems India Pvt Ltd will supply Steam Generator for the plant & Toshiba JSW Power Systems Pvt Ltd will supply super-critical steam turbine and generator and L&T Howden will supply Axial fans to NTPC for the plant. [2]