Search results
Results from the WOW.Com Content Network
Primary oil well control is the process which maintains a hydrostatic pressure in the wellbore greater than the pressure of the fluids in the formation being drilled, but less than formation fracture pressure. It uses the mud weight to provide sufficient pressure to prevent an influx of formation fluid into the wellbore. If hydrostatic pressure ...
The primary functions of a blowout preventer system are to: Confine well fluid to the wellbore; Provide means to add fluid to the wellbore; Allow controlled volumes of fluid to be withdrawn from the wellbore. Additionally, and in performing those primary functions, blowout preventer systems are used to: Regulate and monitor wellbore pressure;
the drilling and operating companies well control policies. For workover or completion operations, other methods are often used. Bullheading is a common way to kill a well during workovers and completions operations but is not often used while drilling. Reverse circulation is another kill method used for workovers that are not used for drilling ...
The primary purpose of a wellhead is to provide the suspension point and pressure seals for the casing strings that run from the bottom of the hole sections to the surface pressure control equipment. [1] While drilling the oil well, surface pressure control is provided by a blowout preventer (BOP).
In the diagram, these are stands of drill pipe which are 2 or 3 joints of drill pipe connected and stood in the derrick vertically, usually to save time while tripping pipe. Drill string (#25) is an assembled collection of drill pipe, heavy weight drill pipe, drill collars and any of a whole assortment of tools, connected and run into the ...
A blowout is the uncontrolled release of crude oil and/or natural gas from an oil well or gas well after pressure control systems have failed. [1] Modern wells have blowout preventers intended to prevent such an occurrence. An accidental spark during a blowout can lead to a catastrophic oil or gas fire.
During the design stage, the diagram also provides the basis for the development of system control schemes, allowing for further safety and operational investigations, such as a Hazard and operability study (HAZOP). To do this, it is critical to demonstrate the physical sequence of equipment and systems, as well as how these systems connect.
The tubing may also have flow control mechanism. Single-well concentric kill string: within the well a small diameter concentric kill string is used to circulate kill fluids when needed. Single-well 2-tubing completion: in this instance 2 tubing strings are inserted down 1 well. They are connected at the lower end by a circulating head.