Ad
related to: sheathing flush with foundation wall construction- Get A Quick Estimate
Just enter your zip code to get
started & receive a fast free quote
- Browse Our Pro Directory
Enter your zip code & browse our
directory of reviewed, local pros.
- Get A Quick Estimate
Search results
Results from the WOW.Com Content Network
In the United States, the International Building Code and ASTM International define Exterior Insulation and Finish System (EIFS) as a non-load-bearing exterior wall cladding system that consists of an insulation board attached either adhesively, mechanically, or both, to the substrate; an integrally reinforced base coat; and a textured protective finish coat.
Shaped like a “U” or channel to catch water (e.g., where the edge of a tile roof meets a wall). Through wall flashing Spans the thickness of the wall and directs water to weep holes. Cap flashing (drip cap) Often used above windows and doors. Drip edge A metal used at the edges of a roof. Step flashing (soaker, base flashing)
A load-bearing wall or bearing wall is a wall that is an active structural element of a building — that is, it bears the weight of the elements above said wall, resting upon it by conducting its weight to a foundation structure. [1] The materials most often used to construct load-bearing walls in large buildings are concrete, block, or brick.
Siding or wall cladding is the protective material attached to the exterior side of a wall of a house or other building. Along with the roof, it forms the first line of defense against the elements, most importantly sun, rain/snow, heat and cold, thus creating a stable, more comfortable environment on the interior side.
Blue fiber cement siding HardiePanel on design-build addition, Ithaca NY. Fiber cement siding (also known as "fibre cement cladding" in the United Kingdom, "fibro" in Australia, and by the proprietary name "Hardie Plank" in the United States) is a building material used to cover the exterior of a building in both commercial and domestic applications.
A typical timber shear wall consists of braced panels in the wall line, constructed using structural plywood sheathing, specific nailing at the edges, and supporting framing. A shear wall is an element of a structurally engineered system that is designed to resist in- plane lateral forces, typically wind and seismic loads.
USG entered a 15-year lease, and occupied the building in early 2007. The new building is occupied 65% by USG and 10% by Humana Inc. As an incentive for USG to remain in the downtown Chicago area, the city of Chicago created a redevelopment agreement that contributed $6.5 million to the construction of the new building. [23]
A double floor is a floor framed with joists supported by larger timbers.. In traditional timber framing there may be a single set of joists which carry both a floor and ceiling called a single floor (single joist floor, single framed floor) or two sets of joists, one carrying the floor and another carrying the ceiling called a double floor (double framed floor).
Ad
related to: sheathing flush with foundation wall construction