Thus, the mean time between peaks, including the residence time or mean time before the very first peak, is the inverse of the frequency of exceedance N −1 (y max). If the number of peaks exceeding y max grows as a Poisson process, then the probability that at time t there has not yet been any peak exceeding y max is e −N(y max)t. [6] Its ...
A sample of probability distributions that may be used can be found in probability distributions. Probability distributions can be fitted by several methods, [ 2 ] for example: the parametric method, determining the parameters like mean and standard deviation from the X data using the method of moments , the maximum likelihood method and the ...
An estimate of the uncertainty in the first and second case can be obtained with the binomial probability distribution using for example the probability of exceedance Pe (i.e. the chance that the event X is larger than a reference value Xr of X) and the probability of non-exceedance Pn (i.e. the chance that the event X is smaller than or equal ...
The theoretical return period between occurrences is the inverse of the average frequency of occurrence. For example, a 10-year flood has a 1/10 = 0.1 or 10% chance of being exceeded in any one year and a 50-year flood has a 0.02 or 2% chance of being exceeded in any one year.
Gumbel has also shown that the estimator r ⁄ (n+1) for the probability of an event — where r is the rank number of the observed value in the data series and n is the total number of observations — is an unbiased estimator of the cumulative probability around the mode of the distribution.
For a dike with an acceptable load exceedance probability per year, such as 1/500 (as with the temporary dike reinforcement in the Oosterschelde), it is necessary to determine the 1/500 wave run-up. This can be calculated if the 1/500 wave height at the toe of the dike is known.
The bPOE is the probability of a tail with known mean value . The figure shows the bPOE at threshold x {\displaystyle x} (marked in red) as the blue shaded area. Therefore, by definition, bPOE is equal to one minus the confidence level at which the Conditional Value at Risk (CVaR) is equal to x {\displaystyle x} .
The hourly PoP is the probability that more than 0.01 inches (0.25 mm) of precipitation would occur if conditions like those in the given hour continued for twelve hours. It can be similar to the daily PoP and vary little, or it can vary dramatically. the daily PoP will be the average of the hourly PoP across the whole day.