Search results
Results from the WOW.Com Content Network
Robotic Hydrodemolition in Ystad, Sweden. Hydrodemolition of concrete exposing the rebar.. Hydrodemolition (also known as hydro demolition, hydroblasting, hydro blasting, hydromilling, waterblasting, and waterjetting) is a concrete removal technique which utilizes high-pressure water, often containing an abrasive material, to remove deteriorated and sound concrete as well as asphalt and grout.
Cement-mortar lined ductile iron pipe is a ductile iron pipe with cement lining on the inside surface, and is commonly used for water distribution. Cement-mortar lined ductile iron pipe is governed by standards set forth by DIPRA ( Ductile Iron Pipe Research Association ), and was first used in 1922 in Charleston, South Carolina .
The energy consumed in manufacturing ductile iron pipe was 19.55 MJ per kg and volume of emissions released during manufacture was 1.430 kg CO 2 per kg, compared to 68.30 MJ per kg of energy and 4.860 kg CO 2 per kg emissions for PVC pipes, and 1.24 MJ per kg and 0.148 kg CO 2 per kg for concrete pipes of the same diameter.
Pipe is usually delivered to a customer or jobsite as either "sticks" or lengths of pipe (typically 20 feet (6.1 m), called single random length) or they are prefabricated with elbows, tees and valves into a prefabricated pipe spool [A pipe spool is a piece of pre-assembled pipe and fittings, usually prepared in a shop so that installation on ...
Both pipe and tube imply a level of rigidity and permanence, whereas a hose is usually portable and flexible. A tube and pipe may be specified by standard pipe size designations, e.g., nominal pipe size, or by nominal outside or inside diameter and/or wall thickness. The actual dimensions of pipe are usually not the nominal dimensions: A 1-inch ...
The tremie concrete placement method uses a vertical or nearly vertical pipe, through which concrete is placed by gravity feed below water level. [4]The lower end of the pipe is kept immersed in fresh concrete so that concrete rising from the bottom displaces the water above it, thus limiting washing out of the cement content of the fresh concrete at the exposed upper surface.
Get AOL Mail for FREE! Manage your email like never before with travel, photo & document views. Personalize your inbox with themes & tabs. You've Got Mail!
Process piping and power piping are typically checked by pipe stress engineers to verify that the routing, nozzle loads, hangers, and supports are properly placed and selected such that allowable pipe stress is not exceeded under different loads such as sustained loads, operating loads, pressure testing loads, etc., as stipulated by the ASME B31, EN 13480, GOST 32388, RD 10-249 or any other ...