Search results
Results from the WOW.Com Content Network
Material take off (MTO) is a term used in engineering and construction, and refers to a list of materials with quantities and types (such as specific grades of steel) that are required to build a designed structure or item. This list is generated by analysis of a blueprint or other design document. The list of required materials for ...
The marine and air transportation, [9] offshore structures, [10] industrial plant and facility management industries depend on maintenance, repair and overhaul (MRO) including scheduled or preventive paint maintenance programmes to maintain and restore coatings applied to steel in environments subject to attack from erosion, corrosion and environmental pollution.
The list typically is Section C of the Uniform Contract Format and consists of a series of individual data items, each of which is recorded on a Data Item form (DD Form 1423) containing the tailored data requirements and delivery information.
The construction documents, specifically the technical specifications, require the contractor to submit product data, samples, and shop drawings to the architect and engineer for approval. This is one of the first steps that is taken by the contractor after execution of the construction contract and issuance of the "Notice to Proceed".
The scope of what constitutes ‘construction work’ has been increased. “Construction work” now means the carrying out of any building, civil engineering or engineering construction work and includes building temporary structures used for events, television, film and entertainment productions. [1]
A bill of quantities is a document used in tendering in the construction industry in which materials, parts, and labor (and their costs) are itemized. It also (ideally) details the terms and conditions of the construction or repair contract and itemizes all work to enable a contractor to price the work for which he or she is bidding. The ...
A Allocation of costs is the transfer of costs from one cost item to one or more other cost items. Allowance - a value in an estimate to cover the cost of known but not yet fully defined work. As-sold estimate - the estimate which matches the agreed items and price for the project scope. B Basis of estimate (BOE) - a document which describes the scope basis, pricing basis, methods ...
It is an official document (whatever is their original language or the language translated to them, such as the texts of laws, regulations, decisions, international agreements, judgments, arbitrators’ awards and the decisions of the administrative committees having judicial competence) or a work transferred to public property (art. 3).