Search results
Results from the WOW.Com Content Network
It is usually marked on the equipment by the manufacturer. It is a calculation of the Minimum Breaking Strength (MBS) also known as Minimum Breaking Load (MBL) divided by a safety factor, usually ranging from 4 to 6 on lifting equipment. The factor can be as high as 10:1 or 10 to 1, if the equipment poses a risk to a person's life.
AHC cranes need to calculate the vertical displacement and/or the velocity of the crane tip position in order to actively heave compensate a load sub-sea. A good AHC-crane is able to keep its load steady with a deviation of a few centimeters in waves up to 8m (+/-4m). AHC cranes are typically used for sub-sea lifting operations or construction ...
Dynamic loads considered in lifting design are accounted for in two stages; suction to the casting bed on the initial lift and then the dynamic loads induced from crane vibration. These crane impact loads must be accounted for during transportation in the yard and on-site, and the coefficient increases from an overhead gantry crane through to a ...
A simple crane. A counterweight is a weight that, by applying an opposite force, provides balance and stability of a mechanical system. [1] The purpose of a counterweight is to make lifting the load faster and more efficient, which saves energy and causes less wear and tear on the lifting machine.
Passive heave compensation is a technique used to reduce the influence of waves upon lifting and drilling operations. [1] A simple passive heave compensator (PHC) is a soft spring which utilizes spring isolation to reduce transmissibility to less than 1. [2]
The Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) are set of regulations created under the Health and Safety at Work etc. Act 1974 which came into force in Great Britain on 5 December 1998 [1] and replaced a number of other pieces of legislation which previously covered the use of lifting equipment.
Greco-Roman Trispastos ("Three-pulley-crane"), a simple crane type (150 kg load) A crane for lifting heavy loads was developed by the Ancient Greeks in the late 6th century BC. [7] The archaeological record shows that no later than c. 515 BC distinctive cuttings for both lifting tongs and lewis irons begin to appear on stone blocks of Greek ...
For example, a crane with a design load of 20 tons is designed to be able to lift loads that weigh 20 tons or less. However, when a failure could be catastrophic, such as a crane dropping its load or collapsing entirely, a factor of safety is necessary. As a result, the crane should lift about 2 to 5 tons at the most.