James W. Walter Sr. (September 18, 1922 – January 6, 2000), of Tampa, Florida, United States, was a home builder who started Jim Walter Homes and Walter Industries, now doing business as Walter Energy, Inc., a leading producer of metallurgical coal for the global steel industry, in 1946 with $1,000 he borrowed from his father.
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
A finished tilt-up building. Tilt-up, tilt-slab or tilt-wall is a type of building and a construction technique using concrete.Though it is a cost-effective technique with a shorter completion time, [1] poor performance in earthquakes has mandated significant seismic retrofit requirements in older buildings.
In 2003, Lindal Cedar Homes partnered with the architect Michael Graves to produce Michael Graves Pavilion, a set of 3 low-cost pavilions distributed through Target. [21] [22] In 2004, it hired architect Jim Cutler, an architect behind Bill Gates's house, to design two floor Reflection Home Series. [23] [24] [25]
Precast concrete molds can be made of timber, steel, plastic, rubber, fiberglass, or other synthetic materials, with each giving a unique finish. [3] In addition, many surface finishes for the four precast wall panel types – sandwich, plastered sandwich, inner layer and cladding panels – are available, including those creating the looks of ...
2-bedroom semi-detached and terraced houses; 3-bedroom semi-detached houses of which there are two styles a gable end at both sides of the house; a sloping hip end at both sides of the house; Short terraces of 3, 4, 6 or 8 houses, each of which either; 2 bedroom end terrace (as found in St. Helens Merseyside) 3-bedroom end or mid-terrace
It is raised off the ground on stumps (Fig. 5); the slab walls are of sawn timber, not flitches split from a trunk (Fig 2.); it uses the nailed 'channel' method of holding the slabs, not mortises; the spaces between the slabs are filled with foam-rubber strips (Fig. 5); no attempt has been made to line or clad the house (Fig. 3); it has no ...
The company's logo prior to its rebranding as Walter Construction Group. Walter Construction Group Limited, known for most of its life as Concrete Constructions Pty Ltd, [1] [2] was one of Australia's oldest and fifth largest construction company [3] prior to its 2005 collapse. The company was founded on 21 April 1920 by Allen Lewis.