Search results
Results from the WOW.Com Content Network
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
2-bedroom semi-detached and terraced houses; 3-bedroom semi-detached houses of which there are two styles a gable end at both sides of the house; a sloping hip end at both sides of the house; Short terraces of 3, 4, 6 or 8 houses, each of which either; 2 bedroom end terrace (as found in St. Helens Merseyside) 3-bedroom end or mid-terrace
Tilt-up, tilt-slab or tilt-wall is a type of building and a construction technique using concrete. Though it is a cost-effective technique with a shorter completion time, [ 1 ] poor performance in earthquakes has mandated significant seismic retrofit requirements in older buildings.
A concrete slab is a common structural element of modern buildings, consisting of a flat, horizontal surface made of cast concrete. Steel- reinforced slabs, typically between 100 and 500 mm thick, are most often used to construct floors and ceilings, while thinner mud slabs may be used for exterior paving ( see below ).
This style of house is also known as a "split foyer". This is a two-story house that has a small entrance foyer with stairs that "split"—part of a flight of stairs go up (usually to the living room, kitchen, and bedrooms) and part of a flight of stairs go down (usually to a family room and garage/storage area). [3]
A single concrete block, as used for construction. Concrete is a composite material composed of aggregate bonded together with a fluid cement that cures to a solid over time. . Concrete is the second-most-used substance in the world after water, [1] and is the most widely used building material
Slab-on-grade or floating slab foundations are a structural engineering practice whereby the concrete slab that is to serve as the foundation for the structure is formed from a mold set into the ground. The concrete is then placed into the mold, leaving no space between the ground and the structure.
Reinforcing steel bars are usually placed inside the forms before concrete is poured to give the concrete flexural strength, similar to bridges and high-rise buildings made of reinforced concrete. Like other concrete formwork, the forms are filled with concrete in 1-foot to 4-foot high "lifts" to manage the concrete pressure and reduce the risk ...