Search results
Results from the WOW.Com Content Network
Feroze Gandhi Unchahar Thermal Power Plant has an installed capacity of 1,550 megawatts (2,080,000 hp), inclusive of Fourth Stage, that got operational in April 2017. The First unit was commissioned in November 1988. The coal for the plant is derived from North Karanpura Coalfield. The water source is from Sarda Sahyak Canal. [3]
The second unit of the 2×195 MW was commissioned on 13 June 2016. Muzaffarpur Thermal Power Station has an installed capacity of 610 MW. Another 500 MW extension has been planned. East Central Railway will provide uninterrupted supply of coal to the thermal power station. [7]
Later in 2002, its installed capacity crossed 20,000 MW. [10] NTPC got listed on BSE and NSE on 5 November 2004. Against the issue price of ₹62 per share, it closed the first day of listing with ₹75.55 per share. [13] On the day of listing, it became the third largest company in India in terms of market capitalisation. [14]
The plant has six induced draft cooling towers (IDCTs), which have a capacity of 30,000 cubic metres per hour (1,100,000 cu ft/h) with nine cells of 14 by 21 metres (46 ft × 69 ft) each. [4] The IDCTs use seawater, which is drawn from the intake channel of North Chennai Thermal Power Station , and fresh water requirement is met from a ...
Cities, towns and locations in the northern portion of Jangipur subdivision, Murshidabad district (including Farakka, Samserganj, Suti II CD blocks) M: municipal town, CT: census town, R: rural/ urban centre, F: Facility
The work of NTPC Super Thermal Power Plant in Kahalgaon started in 1985. [3] In March 1992, the first unit of 210 MW capacity was commissioned. Gradually, its capacity was increased. The total installed capacity of the plant is 2,340 MW.
It has been in the news due to the development of a new power plant by NTPC Limited in that area. The project was started in 2001 by Indian former Prime Minister Atal Bihari Vajpayee . NTPC Sipat has total installed capacity of 2980 MW and has two stages: Stage-I comprises 3 units of 660 megawatts each and Stage-II comprises 2 units of 500 ...
Korba Super Thermal Power Plant of NTPC has installed capacity of 2,600 MW. It gets coal from Gevra and Kusmunda mines. [ 20 ] Chhattisgarh State Power Generation Company Limited has three power stations in the area: Korba East Thermal Power Station has installed capacity of 440 MW, Dr. Shyama Prasad Mukherjee Thermal Power Station (Korba East ...