Search results
Results from the WOW.Com Content Network
In North America, terms such as roughing in and finishing or rough-in and finish work are often heard, referring to similar concepts. Another related set of terms is outside work and inside work (the building is closed to the weather when the latter occurs).
In engineering, the Moody chart or Moody diagram (also Stanton diagram) is a graph in non-dimensional form that relates the Darcy–Weisbach friction factor f D, Reynolds number Re, and surface roughness for fully developed flow in a circular pipe. It can be used to predict pressure drop or flow rate down such a pipe.
A plumbing drawing, a type of technical drawing, shows the system of piping for fresh water going into the building and waste going out, both solid and liquid. It also includes fuel gas drawings. Mainly plumbing drawing consist of water supply system drawings, drainage system drawings, irrigation system drawings, storm water system drawings.
Back siphonage is a plumbing term applied to the reversal of normal water flow in a plumbing system due to sharply reduced or negative pressure on the water supply side, such as high demand on water supply by fire-fighting; [49] it is not an actual siphon as it is suction. [50]
An air gap, as related to the plumbing trade, is the unobstructed vertical space between the water outlet and the flood level of a fixture. [1] Air gaps of appropriate design are legally required by water health and safety regulations in many countries. An air gap is the simplest form of a backflow prevention device.
Get AOL Mail for FREE! Manage your email like never before with travel, photo & document views. Personalize your inbox with themes & tabs. You've Got Mail!
Upgrade to a faster, more secure version of a supported browser. It's free and it only takes a few moments:
The height of the hydraulic jump, similar to length, is useful to know when designing waterway structures like settling basins or spillways. The height of the hydraulic jump is simply the difference in flow depths prior to and after the hydraulic jump. The height can be determined using the Froude number and upstream energy. Equations: