Search results
Results from the WOW.Com Content Network
Borehole Mining (BHM) is a remote operated method of extraction (mining) of mineral resources through boreholes based on in-situ conversion of ores into a mobile form (slurry) by means of high pressure water jetting (hydraulicking). This process is carried-out from a land surface, open pit floor, underground mine or floating vessel through pre ...
Westbay packers or backfilled seals are used to seal the borehole between monitoring zones to prevent the unnatural vertical flow of groundwater in the wellbore and maintain the in situ distribution of fluid pressures and chemistry. The Westbay system can be installed in either open rock boreholes or cased wells with multiple screens.
Nested wells, also referred to as nested monitoring wells, are composed of multiple tubes or pipes, typically terminating with short screened intervals (2–3 ft), installed in single boreholes. Sand packs must be installed at the screen depths and seals in the borehole are constructed between the sand packs.
EN 1997-2 is intended to be used in conjunction with EN 1997-1 and provides rules supplementary to EN 1997-1 related to planning and reporting of ground investigations, general requirements for a range of commonly used laboratory and field tests, interpretation and evaluation of test results and derivation of values of geotechnical parameters and coefficients.
Computer modeling in RockWorks provides a means for tailoring a mine, environmental, petroleum, etc. plan based on the end-user specifications. The basic strategy involves the creation of a borehole database that includes analytical results for various physical and chemical properties as a function of depth. Once the database has been created ...
This creates an impermeable seal from the surface to the next confining layer that keeps contaminants from traveling down the outer sidewalls of the casing or borehole and into the aquifer. In addition, wells are typically capped with either an engineered well cap or seal that vents air through a screen into the well, but keeps insects, small ...
It is the borehole core recovery percentage incorporating only pieces of solid core that are longer than 100 mm in length measured along the centerline of the core. In this respect pieces of core that are not hard and sound should not be counted though they are 100 mm in length.
There are two principal phases of underground mining: development mining and production mining. Development mining is composed of excavation almost entirely in (non-valuable) waste rock in order to gain access to the orebody. There are six steps in development mining: remove previously blasted material (muck out round), scaling (removing any unstable slabs of rock hanging from the roof and ...