Here, the contamination delay is the amount of time needed for a change in the flip-flop clock input to result in the initial change at the flip-flop output (Q). If there is insufficient delay from the output of the first flip-flop to the input of the second, the input may change before the hold time has passed. Because the second flip-flop is ...
The initial formulation of the retiming problem as described by Leiserson and Saxe is as follows. Given a directed graph:= (,) whose vertices represent logic gates or combinational delay elements in a circuit, assume there is a directed edge := (,) between two elements that are connected directly or through one or more registers.
When the delay through the elements is greater than the clock cycle time, the elements are said to be on the critical path. The circuit will not function when the path delay exceeds the clock cycle delay so modifying the circuit to remove the timing failure (and eliminate the critical path) is an important part of the logic design engineer's task.
A glitch (circled in red) occurring during circuit operation. Glitch removal is the elimination of glitches—unnecessary signal transitions without functionality—from electronic circuits. Power dissipation of a gate occurs in two ways: static power dissipation and dynamic power dissipation. Glitch power comes under dynamic dissipation in the ...
Hazards are a temporary problem, as the logic circuit will eventually settle to the desired function. Therefore, in synchronous designs, it is standard practice to register the output of a circuit before it is being used in a different clock domain or routed out of the system, so that hazards do not cause any problems. If that is not the case ...
Lumped C. The entire wire capacitance is applied to the gate output, and the delay through the wire itself is ignored. Elmore delay [5] is a simple approximation, often used where speed of calculation is important but the delay through the wire itself cannot be ignored. It uses the R and C values of the wire segments in a simple calculation.
The problem is similar in nature to the year 2000 problem, the difference being the Year 2000 problem had to do with base 10 numbers, whereas the Year 2038 problem involves base 2 numbers. Analogous storage constraints will be reached in 2106 , where systems storing Unix time as an unsigned (rather than signed) 32-bit integer will overflow on 7 ...
Settling time includes a propagation delay, plus the time required for the output to slew to the vicinity of the final value, ...