enow.com Web Search

  1. Ads

    related to: soil sampling in construction

Search results

  1. Results from the WOW.Com Content Network
  2. Geotechnical investigation - Wikipedia

    en.wikipedia.org/wiki/Geotechnical_investigation

    A soil sample recovered from a test boring using a split spoon sampler. Borings come in two main varieties: large diameter and small diameter. Large-diameter borings are rarely used because of safety concerns and expense but are sometimes used to allow a geologist or an engineer to visually and manually examine the soil and rock stratigraphy in-situ.

  3. Soil test - Wikipedia

    en.wikipedia.org/wiki/Soil_test

    In geotechnical engineering, a soil test can be used to determine the physical characteristics of a soil, such as its water content, void ratio or bulk density. Soil testing can also provide information related to the shear strength, rate of consolidation and permeability of the soil. The following is a non-exhaustive list of engineering soil ...

  4. Standard penetration test - Wikipedia

    en.wikipedia.org/wiki/Standard_penetration_test

    The test uses a thick-walled sampling tube, with an outside diameter of 5.01 cm (2 in) and an inside diameter of 3.5 cm (1.375 in), and a length of at least 60 cm (24 in). The sampling tube is driven into the ground at the bottom of a borehole by blows from a hammer with a mass of 63.5 kg (140 lb) falling a distance of 75 cm (30 in). The sample ...

  5. Phase I environmental site assessment - Wikipedia

    en.wikipedia.org/wiki/Phase_I_environmental_site...

    Phase III investigations aim to delineate the physical extent of contamination based on recommendations made in Phase II assessments. Phase III investigations may involve intensive testing, sampling, and monitoring, "fate and transport" studies and other modeling, and the design of feasibility studies for remediation and remedial plans.

  6. Trial pit - Wikipedia

    en.wikipedia.org/wiki/Trial_pit

    A trial pit (or test pit) is an excavation of ground in order to study or sample the composition and structure of the subsurface, usually dug during a site investigation, a soil survey or a geological survey. Trial pits are dug before the construction. They are dug to determine the geology and the water table of that site.

  7. Soil gradation - Wikipedia

    en.wikipedia.org/wiki/Soil_Gradation

    Soil gradation is determined by analyzing the results of a sieve analysis or a hydrometer analysis. [4] [5] In a sieve analysis, a coarse-grained soil sample is shaken through a series of woven-wire square-mesh sieves. Each sieve has successively smaller openings so particles larger than the size of each sieve are retained on the sieve.

  8. Cone penetration test - Wikipedia

    en.wikipedia.org/wiki/Cone_penetration_test

    One common tool advanced during CPT testing is a geophone set to gather seismic shear wave and compression wave velocities. This data helps determine the shear modulus and Poisson's ratio at intervals through the soil column for soil liquefaction analysis and low-strain soil strength analysis. Engineers use the shear wave velocity and shear ...

  9. Geotechnical engineering - Wikipedia

    en.wikipedia.org/wiki/Geotechnical_engineering

    NAVFAC (Naval Facilities Engineering Command) (1983) Design Manual 7.03, Soil Dynamics, Deep Stabilization and Special Geotechnical Construction, US Government Printing Office; Terzaghi, K., Peck, R.B. and Mesri, G. (1996), Soil Mechanics in Engineering Practice 3rd Ed., John Wiley & Sons, Inc. ISBN 0-471-08658-4

  1. Ads

    related to: soil sampling in construction