Robotic Hydrodemolition in Folkestone, UK. Hydrodemolition of concrete exposing the rebar.. Hydrodemolition (also known as hydro demolition, hydroblasting, hydro blasting, hydromilling, waterblasting, and waterjetting) is a concrete removal technique which utilizes high-pressure water, often containing an abrasive material, to remove deteriorated and sound concrete as well as asphalt and grout.
The process is slow and demanding, requiring teamwork and coordination. To prevent the walls from collapsing and to ensure water quality, the borehole is lined with materials like bricks, stones, or concrete rings. This reinforcement maintains the integrity of the borehole's structure and helps to prevent contamination.
EN 1997-2 is intended to be used in conjunction with EN 1997-1 and provides rules supplementary to EN 1997-1 related to planning and reporting of ground investigations, general requirements for a range of commonly used laboratory and field tests, interpretation and evaluation of test results and derivation of values of geotechnical parameters ...
Requirements for earthquake (seismic code), hurricane, flood, and tsunami resistance, especially in disaster prone areas or for very large buildings where a failure would be catastrophic [citation needed] Requirements for specific building uses (for example, storage of flammable substances, or housing a large number of people)
Geotechnical engineers and engineering geologists perform geotechnical investigations to obtain information on the physical properties of soil and rock underlying and adjacent to a site to design earthworks and foundations for proposed structures and for the repair of distress to earthworks and structures caused by subsurface conditions ...
Also called caissons, drilled shafts, drilled piers, cast-in-drilled-hole piles (CIDH piles) or cast-in-situ piles, a borehole is drilled into the ground, then concrete (and often some sort of reinforcing) is placed into the borehole to form the pile. Rotary boring techniques allow larger diameter piles than any other piling method and permit ...
A USBR soil scientist advances a Giddings Probe direct push soil sampler.. Geotechnical investigations are performed by geotechnical engineers or engineering geologists to obtain information on the physical properties of soil earthworks and foundations for proposed structures and for repair of distress to earthworks and structures caused by subsurface conditions; this type of investigation is ...
In a design-build contract the contractor is established at the outset, and construction activities can proceed concurrently with the design. The third major advantage is that the design-build contractor has an incentive to keep the combined design and construction costs within the owner's budget.