Search results
Results from the WOW.Com Content Network
Construction of the interceptor system required 318 million bricks, 2.7 × 10 6 cubic metres (9.5 × 10 7 cu ft) of excavated earth and 670,000 cubic metres (24,000,000 cu ft) of concrete. [5] The innovative use of Portland cement strengthened the tunnels, which were in good order 150 years later.
Interceptors require a retention time of 30 minutes to allow the fats, oils, grease, and food solids to settle in the tank. As more wastewater enters the tank, the grease-free water is pushed out of the tank. The rotting brown grease inside a grease trap or grease interceptor must be pumped out on a scheduled basis.
KOS+ M openwell submersible pump. Small-scale sewage pumping is normally done by a submersible pump. This became popular in the early 1960s, when a guide rail system was developed to lift the submersible pump out of the pump station for repair, and ended the dirty and sometimes dangerous task of sending people into the sewage or wet pit. [1]
Here it is treated, then disposed through a series pump stations and pipes known as an Interceptor System. [9] As of 2018, the total amount of wastewater facilities include 2 primary treatment plants, 54 pump stations, 1 storage facility, 903 miles of pipe, and 17,708 manholes. [3]
A four pole or six pole AC induction motor normally drives the pump. Rather than provide large open passages, some pumps, typically smaller sewage pumps, also macerate any solids within the sewage breaking them down into smaller parts which can more easily pass through the impeller. The interior of a sewage pump station is a very dangerous place.
Effluent sewer systems are a much less common sewage disposal method than gravity sewer systems that use gravity, as well as pumping where needed, to send raw sewage and other wastewater straight from consumers to a sewage treatment plant. There are two main types of gravity sewers, sanitary and combined. Sanitary sewers only treat the ...
Three teens face charges after a Marta bus driver, identified as Leroy Ramos, was killed, officials say.
A force main or rising main [8] is a pumped sewer that may be necessary where gravity sewers serve areas at lower elevations than the sewage treatment plant, or distant areas at similar elevations. A lift station is a sewer sump that lifts accumulated sewage to a higher elevation.