Search results
Results from the WOW.Com Content Network
A common example is polyethylene sheeting laid under a concrete slab to prevent the concrete from gaining moisture through capillary action. [5] A DPM may be used for the DPC. Integral damp proofing in concrete involves adding materials to the concrete mix to make the concrete itself impermeable.
In practice, creep during drying is inseparable from shrinkage. The rate of creep increases with the rate of change of pore humidity (i.e., relative vapor pressure in the pores). For small specimen thickness, the creep during drying greatly exceeds the sum of the drying shrinkage at no load and the creep of a loaded sealed specimen (Fig. 1 bottom).
Suspended slab under construction, with the formwork still in place Suspended slab formwork and rebar in place, ready for concrete pour. A concrete slab is a common structural element of modern buildings, consisting of a flat, horizontal surface made of cast concrete. Steel-reinforced slabs, typically between 100 and 500 mm thick, are most ...
It must allow the architecture to work, and the building services to fit within the building and function (air conditioning, ventilation, smoke extract, electrics, lighting, etc.). The structural design of a modern building can be extremely complex and often requires a large team to complete. Structural engineering specialties for buildings ...
Waffle slabs are preferred for spans greater than 40 feet (12 m), because, for a given mass of concrete, they are much stronger than flat slabs, flat slabs with drop panels, two-way slabs, one-way slabs, and one-way joist slabs. [2] Section of a waffle slab including beam, ribs, and column head
Diamond grinding is a pavement preservation technique that corrects a variety of surface imperfections on both concrete and asphalt concrete pavements. Most often utilized on concrete pavement, diamond grinding is typically performed in conjunction with other concrete pavement preservation (CPP) techniques such as road slab stabilization, full- and partial-depth repair, dowel bar retrofit ...
The test is carried out using a metal mould in the shape of a conical frustum known as a slump cone or Abrams cone, that is open at both ends and has attached handles.The tool typically has an internal diameter of 100 millimetres (3.9 in) at the top and of 200 millimetres (7.9 in) at the bottom with a height of 305 millimetres (12.0 in).The cone is placed on a hard non-absorbent surface.
For a given drip chamber (when the fluid drips from the hole into the chamber) drop factor means number of drops per ml of the IV fluid. Flow rate can be calculated with the help of the observations from the drip chamber and its drop factor. The unit of flow rate is gtts/min, where gtts means guttae (Latin plural noun meaning “drops”).