These holes range in size from 3/8" up to 3" depending on the process used. Initial material injections fill any under slab void space. Once the void space is filled, subsequent injections will start lifting the concrete within minutes. After the slabs are lifted, the access holes are patched and the work is complete.
A third method uses a pictorial tablature similar to the ocarina's finger hole pattern, with blackened holes that represent holes to cover. The tablature represents the holes on the top of the ocarina, and, where necessary, the holes on the underside. This enables easy playing, particularly for beginners. The two most popular tablature systems are:
Traffic crawls over a closed Fort Point Channel Tunnel entrance in Boston during rush hour on July 11, 2006, a day after the collapse.. The Big Dig ceiling collapse occurred on July 10, 2006, when a concrete ceiling panel and debris weighing 26 short tons (52,000 lb; 24,000 kg) and measuring 20 by 40 feet (6.1 by 12.2 m) fell in Boston's Fort Point Channel Tunnel (which connects to the Ted ...
Shoring is designed to prevent collapse where shielding is only designed to protect workers when collapses occur. Concrete-structure and stone-building shoring, in these cases also referred to as falsework, provides temporary support until the concrete becomes hard and achieves the desired strength to support loads.
A corrugated slab is designed when the concrete is poured into a corrugated steel tray, more commonly called decking. This steel tray improves strength of the slab, and prevents the slab from bending under its own weight. The corrugations run in one direction only. A ribbed slab gives considerably more strength in one direction. This is ...
Grouted tiebacks can be constructed as steel rods drilled through a concrete wall out into the soil or bedrock on the other side. Grout is then pumped under pressure into the tieback anchor holes to increase soil resistance and thereby prevent tiebacks from pulling out, reducing the risk for wall destabilization.
For premium support please call: 800-290-4726 more ways to reach us
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...