Search results
Results from the WOW.Com Content Network
Main page; Contents; Current events; Random article; About Wikipedia; Contact us; Pages for logged out editors learn more
The South Devon Railway directors agreed on 28 August 1844 to Brunel's proposal to use atmospheric power on their line. Brunel estimated that by reducing the double-track locomotive worked line to a single track atmospheric line a saving of £8,000 per year could be made. [ 1 ]
Most of the world uses 50 Hz 220 or 230 V single phase, or 400 V three-phase for residential and light industrial services. In this system, the primary distribution network supplies a few substations per area, and the 230 V / 400 V power from each substation is directly distributed to end users over a region of normally less than 1 km radius.
Isambard Kingdom Brunel (/ ˈ ɪ z ə m b ɑːr d ˈ k ɪ ŋ d ə m b r uː ˈ n ɛ l / IZZ-əm-bard KING-dəm broo-NELL; 9 April 1806 – 15 September 1859 [1]) was an English civil engineer and mechanical engineer [2] who is considered "one of the most ingenious and prolific figures in engineering history", [3] "one of the 19th-century engineering giants", [4] and "one of the greatest ...
It seems [25] that Brunel originally specified 12-inch (300 mm) for the level section to Newton and 15-inch (380 mm) pipes for the hilly part of the route, and in specifying the stationary engine power and vacuum pumps, he considerably underpowered them. The 12-inch (300 mm) pipes seem to have been scrapped, and 15-inch (380 mm) pipes installed ...
This well was some 400 ft (120 m) away and the pumps operated by a horizontal reciprocating wooden spear housed in a tunnel running from the engine house to the top of the well. The Sadler engine was a house-built table engine installed in a single-storey engine house with integral boiler; it replaced one of the horse-drives to the chain pumps.
The first 400 kV line was the 150 mile section between West Burton power station in Nottinghamshire and Sundon substation in Bedfordshire; the line had a capacity of 1,800 MVA per circuit. [3] The first 400 kV substations in Scotland were commissioned in 1972 associated with the line from Hunterston, Ayrshire to Neilston, Renfrewshire.
North Valmy Generating Station. North Valmy Generating Station is a 522-megawatt (700,000 hp) coal-fired power station located near Valmy, Nevada. The plant is jointly owned by NV Energy and Idaho Power. [1] Coal is delivered to the location by the Union Pacific Railroad and originates in Utah and Wyoming. [2]