Six main interceptor sewers, totaling almost 100 miles (160 km) in length, were constructed, some incorporating stretches of London's 'lost' rivers. Three of these sewers were north of the river, the southernmost, low-level one being incorporated in the Thames Embankment .
The Detroit River Interceptor (DRI) follows the Detroit River riverbank, and collects sewage from the eastern sewer service area, ultimately following Jefferson Boulevard and arriving at Pump Station No. 1 from the south. The Oakwood Interceptor conveys raw sewage from the western service area which comprises Dearborn and the western suburbs.
Effluent sewer systems are a much less common sewage disposal method than gravity sewer systems that use gravity, as well as pumping where needed, to send raw sewage and other wastewater straight from consumers to a sewage treatment plant. There are two main types of gravity sewers, sanitary and combined. Sanitary sewers only treat the ...
In March 2020, Wellington Water reported the discovery of severe corrosion in the large main trunk sewer (the interceptor) over a length of 250 m in a section close to the treatment plant near Moa Point. [39] Work commenced on re-lining the affected section of the interceptor in April. [48]
He and his colleagues, including William Haywood, designed an extensive underground sewerage system that diverted waste to the Thames Estuary, downstream of the main centre of population. Six main interceptor sewers, totalling almost 160 km (100 miles) in length, were constructed, some incorporating stretches of London's "lost" rivers.
Three city projects are planned to reduce sewage overflow into the Cuyahoga River: the Northside Interceptor Tunnel, in red; the lower northside interceptor lining project, in blue; and the ...
Millions of litres of raw sewage was pumped into one of the UK's most famous lakes after a fault. ... Skip to main content. Sign in. Mail. 24/7 Help. For premium support please call: 800-290-4726 ...
The Liverpool Corporation area expanded in 1895 and 1913, as outlying districts were absorbed. They inherited sewage works at Walton and Fazakerley, both draining into the River Alt, and at Woolton, draining into Ditton Brook. Extra capacity at Fazakerley was created in 1913 by constructing an 8-foot (2.4 m) diameter sewer, to carry effluent ...