Search results
Results from the WOW.Com Content Network
In 1931 the Overland Limited dropped its extra fare and combined with the 63-hour train on its route; the Chief was the only extra fare trans-continental train thereafter, until the streamliners. In February 1936 it was scheduled at 53 hours 45 minutes to Los Angeles, compared to 61 hours for the Los Angeles Limited , Golden State Limited and ...
The Super Chief quickly became "the" train to ride between Chicago and Los Angeles, much as New York Central's 20th Century Limited was the favored travel option of the time for the East Coast-bound. To acquaint passengers with the various points of interest located along the route, Santa Fe built seven signs marking such notable features as ...
The Los Angeles Metro Rail is an urban rail transit system in Los Angeles County, California, operated by the Los Angeles County Metropolitan Transportation Authority (LACMTA or Metro). The system includes 102 metro stations with two rapid transit (known locally as a subway) and four light rail lines, covering 109 miles (175 km) of route ...
The Los Angeles Metro Rail is an urban rail transit system serving Los Angeles County, California, United States, consisting of six lines: four light rail lines (the A, C, E and K lines) and two rapid transit lines (the B and D lines), serving a total of 102 stations.
Going the full distance from Santa Monica to East L.A. will take 1 hour and 9 minutes, and traveling from Azusa to Long Beach will take 1 hour and 58 minutes, according to Metro.
Metrolink ticket vending machines. Machines also sell tickets for Amtrak trains and the FlyAway (bus) bus service to Los Angeles International Airport. Metrolink's fare structure is based on a flat fee for boarding the train and an additional distance cost with fares calculated in 25-cent increments between stations.
The full travel time of the 48.5-mile (78.1 km) [2] line is approximately two hours, including a brief layover at Union Station to change train crews. Southbound trips over the full line are scheduled at 1 hour and 55 minutes, with northbound trips scheduled at 1 hour and 55 minutes.
In 1894, the Pasadena & Los Angeles Electric Railway purchased, re-gauged, electrified, and double-tracked a section of the line for streetcar use. [4] Service began on May 6, 1895. [5] Pacific Electric acquired the route in 1898. The line was again rebuilt to standard gauge with service between Pasadena and Los Angeles beginning in December 1902.