Search results
Results from the WOW.Com Content Network
Examples of isolation groups include the main steamlines, the reactor water cleanup system, the reactor core isolation cooling (RCIC) system, shutdown cooling, and the residual heat removal system. For pipes which inject water into the containment, two safety-related check valves are generally used in lieu of motor operated valves.
The essential service water system (ESWS) circulates the water that cools the plant's heat exchangers and other components before dissipating the heat into the environment. Because this includes cooling the systems that remove decay heat from both the primary system and the spent fuel rod cooling ponds, the ESWS is a safety-critical system. [7]
The Fukushima Daiichi nuclear disaster in 2011 occurred due to a loss-of-coolant accident. The circuits that provided electrical power to the coolant pumps failed causing a loss-of-core-cooling that was critical for the removal of residual decay heat which is produced even after active reactors are shut down and nuclear fission has ceased.
Another example was the Isolation Condenser system, which relied on the principle of hot water/steam rising to bring hot coolant into large heat exchangers located above the reactor in very deep tanks of water, thus accomplishing residual heat removal. Yet another example was the omission of recirculation pumps within the core; these pumps were ...
The AHWR incorporates several passive safety features. These include: Core heat removal through natural circulation; direct injection of emergency core coolant system (ECCS) water in fuel; and the availability of a large inventory of borated water in overhead gravity-driven water pool (GDWP) to facilitate sustenance of core decay heat removal.
When pressure control is lost in a reactor plant, depending on the level of heat being generated by the reactor plant, the heat being removed by the steam or other auxiliary systems, the initial pressure, and the normal operating temperature of the plant, it could take minutes or even hours for operators to see significant trends in core behaviour.
Following the reactor SCRAM, operators activated the reactor core isolation cooling system (RCIC) and the residual heat removal system and core spray systems were made available to cool the suppression pool; whether they were activated prior to the tsunami has not been made clear. The RHRS and CS pumps were knocked out of commission by the tsunami.
Initially the high pressure coolant injection (HPCI) system was primary cooling the core and at 15:00 operators activated the residual heat removal system main pump and the containment vessel spray pump at 15:07 to cool the suppression pool; all these systems failed following both AC power and DC power loss after the tsunami as the diesel ...