Search results
Results from the WOW.Com Content Network
In civil engineering, concrete leveling is a procedure that attempts to correct an uneven concrete surface by altering the foundation that the surface sits upon. It is a cheaper alternative to having replacement concrete poured and is commonly performed at small businesses and private homes as well as at factories, warehouses, airports and on roads, highways and other infrastructure.
Self-leveling concrete was invented in 1952 by Axel Karlsson from Sweden. The first product was a combination of wood glue, fine sand and cement with additives. [1] It was called flytspackel, which directly translates to "floating putty". The term self-leveling can be traced back to a patent applied by the company Lafarge in 1997. [2]
A level architectural deck may be intended for use by people, e.g., what in the UK is usually called a decked patio. "Roof deck" refers to the flat layer of construction materials to which the weather impervious layers are attached to a form a roof, and they may be either level (for a "flat" rooftop) or sloped.
The longest stone stairs in Japan are the 3,333-step stairs of the Shakain temple in Yatsushiro, Kumamoto. [52] The second ones, Mount Haguro stone stairs, have 2,446 steps in Tsuruoka, Yamagata. The CN Tower's staircase reaches the main deck level after 1,776 steps and the Sky Pod above after 2,579 steps; it is the tallest metal staircase on ...
Layers in the construction of a mortarless pavement: A.) Subgrade B.) Subbase C.) Base course D.) Paver base E.) Pavers F.) Fine-grained sand Section through railway track and foundation showing the sub-grade. In transport engineering, subgrade is the native material underneath a constructed road, [1] pavement or railway track (US: railroad track).
The mix is prepared on site using a specialized truck. The truck contains a tank for water, a mixing tank, a holding tank, a pump, and a conveyor for the sand and calcined gypsum. A hopper for the sand and gypsum is mounted externally on the vehicle. [8] To prepare the mix, the sand and calcined gypsum are added to the hopper and mixed.
The drainage system collects any water entering the basement and drains it to an internally placed sump pump system, which will then pump the water out of the basement. The Federal Emergency Management Agency (FEMA) recommends basement waterproofing with a water alarm and "battery-operated backup pump" as a preventive measure against the high ...
Invert level affects flow from drainage pipes In civil engineering , the invert level is the base interior level of a pipe, trench or tunnel ; it can be considered the "floor" level. [ 1 ] The invert is an important datum for determining the functioning or flowline of a piping system.