Search results
Results from the WOW.Com Content Network
Main page; Contents; Current events; Random article; About Wikipedia; Contact us; Donate
IEC 62040 Uninterruptible power systems (UPS) IEC 62041 Transformers, power supplies, reactors and similar products – EMC requirements; IEC 62044 Cores made of soft magnetic materials – Measuring methods; IEC TS 62045 Multimedia security – Guideline for privacy protection of equipment and systems in and out of use
Transformers are the most critical assets of electrical transmission and distribution systems, and their failures could cause power outages, personal and environmental hazards, and expensive rerouting or purchase of power from other suppliers. Identifying a transformer which is near failure can allow it to be replaced under controlled ...
As transformer oil deteriorates through aging and moisture ingress, transformer oil should, depending on economics, transformer duty and other factors, be tested periodically. [5] Electric utility companies have a vested interest in periodic oil testing because transformers represent a large proportion of their total assets. Through such ...
Three-phase HV/MV power transformers, located in distribution substations, are the most common source of supply for distribution networks, and type of grounding of their neutral determines the earthing system. There are five types of neutral earthing: [26] Solid-earthed neutral; Unearthed neutral; Resistance-earthed neutral. Low-resistance earthing
Examples for such substations are Brauweiler in Germany and Hradec in the Czech Republic, where power is collected from nearby lignite-fired power plants. If no transformers are required for increasing the voltage to transmission level, the substation is a switching station.
The commissioning plan is modified as the commissioning process progresses throughout the design, construction, and final acceptance of the facility. The functional performance test procedures are typically developed by the CxP with assistance of the trade contractors, vendors, and manufacturers based on the design engineer's contract documents.
A Multi Stage Gas Extractor is a device for sampling transformer oil. During 2004, Central Power Research Institute, Bangalore, India introduced a novel method in which a same sample of transformer oil could be exposed to vacuum many times, at ambient temperature, until there is no increase in the volume of extracted gases. This method was ...