Search results
Results from the WOW.Com Content Network
The calculation of reinforcement requirements for a one-way slab can be extremely tedious and time-consuming, and one can never be completely certain of the best design. [citation needed] Even minor changes to the project can necessitate recalculation of the reinforcement requirements. There are many factors to consider during the structural ...
Marcus's method is a structural analysis used in the design of reinforced concrete slabs.The method was developed by Henri Marcus and described in 1938 in Die Theorie elastischer Gewebe und ihre Anwendung auf die Berechnung biegsamer Platten. [1]
Waffle slabs are preferred for spans greater than 40 feet (12 m), because, for a given mass of concrete, they are much stronger than flat slabs, flat slabs with drop panels, two-way slabs, one-way slabs, and one-way joist slabs. [2] Section of a waffle slab including beam, ribs, and column head
Since the 1950s there have been several attempts to develop theories for arching action in both one and two-way slabs. [5] [6] [7] One of the principal approaches to membrane action was that due to Park [8] which has been used as a basis for many studies into arching action in slabs. Park's approach was based on rigid plastic slab strip theory ...
E slab is the total energy of surface slab obtained using density functional theory. N is the number of atoms in the surface slab. E bulk is the bulk energy per atom. A is the surface area. For a slab, we have two surfaces and they are of the same type, which is reflected by the number 2 in the denominator.
Hudson's equation, also known as Hudson formula, is an equation used by coastal engineers to calculate the minimum size of riprap (armourstone) required to provide satisfactory stability characteristics for rubble structures such as breakwaters under attack from storm wave conditions.
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
The Filigree Wideslab method is a process for construction of concrete floor decks from two interconnected concrete placements, one precast in a factory, and the other done in the field. The method was developed during the late 1960s by Harry H. Wise as a more efficient and economic construction process than conventional cast-in-place technologies.