Stuart [1] was the first pioneer to study the interference phenomenon of closely spaced surface strip footing. He examined the effect of footing interference on ultimate bearing capacity of strip footings by theoretical analysis using limit equilibrium method, assuming a non-linear failure surface wherein the cross-section composed of logarithmic spiral and straight line portion tangent to the ...
Damp proofing in construction is a type of moisture control applied to building walls and floors to prevent moisture from passing into the interior spaces. Dampness problems are among the most frequent problems encountered in residences. DPC visible between concrete foundation and brickwork.
The first expanded polystyrene ICF Wall forms were developed in the late 1960s with the expiration of the original patent and the advent of modern foam plastics by BASF. [citation needed] Canadian contractor Werner Gregori filed the first patent for a foam concrete form in 1966 with a block "measuring 16 inches high by 48 inches long with a tongue-and-groove interlock, metal ties, and a waffle ...
Concrete is poured around these plastic forms to create internal voids in the slab A voided biaxial slab installation in Turkey. Voided biaxial slabs, sometimes called biaxial slabs or voided slabs, are a type of reinforced concrete slab which incorporates air-filled voids to reduce the volume of concrete required.
Thermal Integrity Profiling (TIP) is a non-destructive testing method used to evaluate the integrity of concrete foundations. It is standardized by ASTM D7949 - Standard Test Methods for Thermal Integrity Profiling of Concrete Deep Foundations. The testing method was first developed in the mid 1990s at the University of South Florida.
Epoxy moisture control systems can be applied over concrete with relative humidity levels up to 100%, and there are systems available on the market today that can be applied over concrete that is physically damp. In some cases, with the use of an epoxy moisture control system, floor coverings can be installed just 7 days after the slab is poured.
Concrete walls are often used at the transition between elevated road fill and overpass structures. The wall is used both to retain the soil and so enable the use of a shorter span and also to transfer the weight of the span directly downward to footings in undisturbed soil.
It can detect internal voids, delaminations, and cracks in concrete structures such as bridge decks, highway pavements, garage floors, parking lot pavements, and building walls. As a testing technique, some of its most important qualities are that (1) it is accurate; (2) it is repeatable; (3) it need not inconvenience the public; and (4) it is ...