Search results
Results from the WOW.Com Content Network
The Severn Beach line from Severn Beach to Bristol Temple Meads. A new station will be built at Portway providing an alternative link from the Park and Ride. The line would have a half-hourly service from Bristol Temple Meads to Avonmouth, and hourly to Severn Beach. The Great Western Main Line from Bristol Temple Meads to Bath Spa.
The Severn Beach line is a suburban railway line in Bristol and Gloucestershire, England, which runs from Bristol Temple Meads to Severn Beach, and used to extend to Pilning. [2] The first sections of the line were opened in 1865 as part of the Bristol Port Railway and Pier ; the section through Bristol was opened in 1875 as the Clifton ...
Bristol Temple Meads is the oldest and largest railway station in Bristol, England.It is located 118 miles 31 chains (118.39 mi; 190.5 km) away from London Paddington.It is an important transport hub for public transport in the city; there are bus services to many parts of the city and surrounding districts, with a ferry to the city centre.
The Cross Country Route from Bristol Temple Meads to Yate. The Severn Beach line in its entirety from Pilning to Bristol Temple Meads, including New Passage. The Henbury Loop in its entirety, from the junction at Avonmouth to the diamond. The Bristol and North Somerset Railway from Bristol Temple Meads to Whitchurch Halt. The Mangotsfield and ...
The station is on the Severn Beach Line from Bristol Temple Meads to Severn Beach, 2 miles 68 chains (4.6 km) [note 1] from Bristol Temple Meads, and 10 miles 55 chains (17.2 km) from Severn Beach. [ 3 ] [ 4 ] [ 5 ] It is the third station from Temple Meads, and first station of the branch part of the line (the first two stations, Lawrence Hill ...
The lines would have services to/from Bristol Temple Meads, and were each expected to carry 0.4 million passengers per year. [34] In April 2016, it was reported that the North Somerset Council had agreed to buy two parcels of land for the creation of the Portishead and Pill stations at the cost of £880,000. [35]
In 1914 it was temporarily renamed "Exhibition Station" for the Bristol International Exhibition. The station was 8 miles 75 chains (14.4 km) from the line's terminus at Portishead, [note 2] 2 miles 79 chains (4.8 km) from Bristol Temple Meads and 121 miles 30 chains (195.3 km) from the Great Western Railway's terminus at London Paddington.
Severn Beach in 1981. The railway reached Severn Beach in 1900, but was at first used only for goods traffic to Pilning.A platform was built beside the line at Severn Beach by the Great Western Railway in 1922, and a bay platform added to the west for excursion traffic, with terminating passenger services from Bristol starting on 26 May 1924, subsequently extended to Pilning in a loop back to ...