Search results
Results from the WOW.Com Content Network
The water-water energetic reactor (WWER), [1] or VVER (from Russian: водо-водяной энергетический реактор; transliterates as vodo-vodyanoi enyergeticheskiy reaktor; water-water power reactor) is a series of pressurized water reactor designs originally developed in the Soviet Union, and now Russia, by OKB Gidropress. [2]
List of free analog and digital electronic circuit simulators, available for Windows, macOS, Linux, and comparing against UC Berkeley SPICE.The following table is split into two groups based on whether it has a graphical visual interface or not.
DRAGON 3.05D, Reactor Cell Calculation System with Burnup nesc0784 DSNP, Program and Data Library System for Dynamic Simulation of Nuclear Power Plant nea-1683 ERANOS 2.3N, Modular code and data system for fast reactor neutronics analyses nea-1916 FINPSA TRAINING 2.2.0.1 -R-, a PSA model in consisting of event trees, fault trees, and cut sets
Safe Shutdown earthquake of intensity up to 8 on MSK-64 scale at maximum horizontal acceleration on a free ground surface of 0.25 g; Design-Basis earthquake of intensity up to 7 on MSK-64 scale at maximum horizontal acceleration on a free ground surface of 0.12 g; Crash of a 20 t aircraft at a speed of 215 m/s as design initial event
The AP1000 design traces its history to two previous designs, the AP600 and the System 80.. The System 80 design was created by Combustion Engineering and featured a two-loop cooling system with a single steam generator paired with two reactor coolant pumps in each loop that makes it simpler and less expensive than systems which pair a single reactor coolant pump with a steam generator in each ...
The MH-1A had an elaborate analog-computer-powered simulator installed at the Training Division, USAERG, Ft. Belvoir. The MH-1A simulator was obtained by Memphis State University Center for Nuclear Studies in the early 1980s, but was never restored or returned to operational service. Its dismantling was completed in March 2019. [21]
The free tours begin and end at the visitor center at 2000 Logston Blvd., Richland, Wash., and include 45-minute bus rides to and from the reactor. About two hours is spent at the reactor.
Reactor Status Capacity in MWe Construction start First criticality Grid Connection Commercial operation Closure Notes Type Model Net Gross I 1 PWR: VVER-1000: Operational 917: 1000 31 March 2002 13 July 2013 22 October 2013 31 December 2014 — [35] 2 PWR: VVER-1000: Operational 917: 1000 4 July 2002 10 July 2016 29 August 2016 31 March 2017 ...