Variance analysis, in budgeting or management accounting in general, is a tool of budgetary control and performance evaluation, assessing any variances between the budgeted, planned, or standard amount, and the actual amount realized. Variance analysis can be carried out for both costs and revenues.
To measure cost performance, planned value (BCWS) and earned value (BCWP) must be in the same currency units as actual costs. In large implementations, the planned value curve is commonly called a Performance Measurement Baseline (PMB) and may be arranged in control accounts, summary-level planning packages, planning packages and work packages.
BCWP is contrasted to Budgeted Cost of Work Scheduled (BCWS) also called Planned Value (PV). BCWS is the sum of the budget items for all work packages, planning packages, and overhead which was scheduled for the period, rather than the cost of the work actually performed.
There are two reasons actual sales can vary from planned sales: either the volume sold varied from the expected quantity, known as sales volume variance, or the price point at which units were sold differed from the expected price points, known as sales price variance. Both scenarios could also simultaneously contribute to the variance.
The value of work done (VOWD) is a project management technique for measuring and estimating the project cost at a point in time. It is mainly used in project environments of the Petroleum industry and is defined as the value of goods and services progressed, regardless of whether or not they have been paid for or received.
The Actual/360 method calls for the borrower for the actual number of days in a month. This effectively means that the borrower is paying interest for 5 or 6 additional days a year as compared to the 30/360 day count convention. Spreads and rates on Actual/360 transactions are typically lower, e.g., 9 basis points.
Price variance (Vmp) is a term used in cost accounting which denotes the difference between the expected cost of an item (standard cost) and the actual cost at the time of purchase. [1] The price of an item is often affected by the quantity of items ordered, and this is taken into consideration.
In accounting, the inventory turnover is a measure of the number of times inventory is sold or used in a time period such as a year. It is calculated to see if a business has an excessive inventory in comparison to its sales level.