Nashik Thermal Power Station has an installed capacity of 140*2+210*3=910 MW. The first unit was commissioned in 1970. the cost of unit including civil works was Rs 56.5 crores. and the second unit also commissioned with the same cost under the first stage. the second stage consists of three units of 210 MW each was commissioned in the later years.
The power station has a planned capacity of 1320 MW (2x660 MW). [4] The first unit of Solapur Super Thermal power station was commissioned and declared commercial on 25 September 2017. [ 5 ]
Stage Unit Number Installed Capacity (Date of Commissioning First: 1: 200: January, 1986 First: 2: 200: December, 1986 First: 3: 200: August, 1987 Second: 4: 500 ...
The power plant is one of the coal based power plants of NTPC Limited. [2] In the year 1992, Uttar Pradesh State Electricity Board (U.P.S.E.B.) transferred Unchahar Thermal Power Station to NTPC Limited against payment overdue and later on renamed it to Feroze Gandhi Unchahar Thermal Power Plant by NTPC Limited.
The project has an installed capacity of 2980 MW consisting of two stages, stage one which got commissioned late was of 3 units of 660 MW each involving super-critical boilers technology and stage two consisted of 2 units of 500 MW each. PM Manmohan Singh inaugurated the Sipat Thermal Power Plant on September 20, 2013.
Unit 1: 1 November 1979 Unit 2: 10 October 1980 Unit 3: 5 October 1980 Unit 4: 23 August 1990 Unit 5: 31 March 1994 Unit 6: 24 February 1995 Unit 7: 6 April 2009 Unit 8: 19 December 2023 [1] Operator: APGENCO: Thermal power station ; Primary fuel: Coal: Power generation; Units operational: 6 X 210 MW 1 X 500 MW 1 X 800 MW: Nameplate capacity ...
The PPA agreement was signed between NTPC, OSEB and GoO on 08-03-1995 (with reference to an MOU signed between NTPC and GoO on 11-10-1994). Talcher TPS was transferred to NTPC on 03-06-1995 in pursuance to the Talcher Thermal Power Station (Transfer and Acquisition Act, 1994) with an objective to improve its performance using NTPC’s technical ...
Talcher Super Thermal Power Station or NTPC Talcher Kaniha located in Angul district of the Indian state of Odisha is the first mega power plant of India to have an installed generation capacity of 3000MW. The power plant is one of the coal-based power plants of NTPC.