Ads
related to: blanking plug oil and gas pipe specifications comparison
Search results
Results from the WOW.Com Content Network
Pipe plugs are used with supplementary accessories such as air and water hoses, air and pressure control devices, gauges, adapters and chains depending on the type of the pipe plug and the process. Auxiliary equipment like compressors for inflating the pipe plugs, water tanks for filling the pipeline and pumps for some cases must be used.
Drill pipe (#16) is a joint of hollow tubing used to connect the surface equipment to the bottom hole assembly (BHA) and acts as a conduit for the drilling fluid. In the diagram, these are stands of drill pipe which are 2 or 3 joints of drill pipe connected and stood in the derrick vertically, usually to save time while tripping pipe.
A plug is a short barbed fitting with a blank end that can only be used with PEX piping to end the continuation of a water line that is no longer in use due to tying in elsewhere within the system or to seal the end of a water line which may be used for future use in the case of additional facilities. All plugs are sealed watertight with a PEX ...
Chainhand (also motorman): An experienced laborer capable of maintaining most parts of the rig. The chainhand is in charge of throwing the chain to make up or break down pipe stands during tripping pipe. They are also responsible for maintaining the motors on the drilling rig; Choke: Tool used to slow down the flow of liquid or gas.
Wireline truck rigged up to a drilling rig in Canada. In the oil and gas industry, the term wireline usually refers to the use of multi-conductor, single conductor or slickline cable, or "wireline", as a conveyance for the acquisition of subsurface petrophysical and geophysical data and the delivery of well construction services such as pipe recovery, perforating, plug setting and well ...
Hydrostatic tests are conducted under the constraints of either the industry's or the customer's specifications, or may be required by law. The vessel is filled with a nearly incompressible liquid – usually water or oil – pressurised to test pressure, and examined for leaks or permanent changes in shape.
Gas lift well: gas is fed into valves installed in mandrels in the tubing strip. The hydrostatic head is lowered and the fluid is gas lifted to the surface. Single-well alternate completions: in this instance there is a well with two zones. In order to produce from both the zones are isolated with packers.
Process piping and power piping are typically checked by pipe stress engineers to verify that the routing, nozzle loads, hangers, and supports are properly placed and selected such that allowable pipe stress is not exceeded under different loads such as sustained loads, operating loads, pressure testing loads, etc., as stipulated by the ASME B31, EN 13480, GOST 32388, RD 10-249 or any other ...
Ads
related to: blanking plug oil and gas pipe specifications comparison