Search results
Results from the WOW.Com Content Network
An example of a short-term bottleneck would be a skilled employee taking a few days off. Long-term bottlenecks occur all the time and can cumulatively significantly slow down production. An example of a long-term bottleneck is when a machine is not efficient enough and as a result has a long queue. [2]
Throughput Accounting also pays particular attention to the concept of 'bottleneck' (referred to as constraint in the Theory of Constraints) in the manufacturing or servicing processes. Throughput Accounting uses three measures of income and expense: The chart illustrates a typical throughput structure of income (sales) and expenses (TVC and OE).
The term "bottleneck" is explained by a common type of application of the problem, where the cost is the duration of the task performed by an agent. In this setting the "maximum cost" is "maximum duration", which is the bottleneck for the schedule of the overall job, to be minimized.
The Shifting Bottleneck Heuristic is a procedure intended to minimize the time it takes to do work, or specifically, the makespan in a job shop. The makespan is defined as the amount of time, from start to finish, to complete a set of multi-machine jobs where machine order is pre-set for each job.
The information bottleneck method is a technique in information theory introduced by Naftali Tishby, Fernando C. Pereira, and William Bialek. [1] It is designed for finding the best tradeoff between accuracy and complexity (compression) when summarizing (e.g. clustering) a random variable X, given a joint probability distribution p(X,Y) between X and an observed relevant variable Y - and self ...
In engineering, a bottleneck is a phenomenon by which the performance or capacity of an entire system is severely limited by a single component. The component is sometimes called a bottleneck point. The term is metaphorically derived from the neck of a bottle, where the flow speed of the liquid is limited by its neck.
A bottleneck edge is the highest weighted edge in a spanning tree. A spanning tree is a minimum bottleneck spanning tree if the graph does not contain a spanning tree with a smaller bottleneck edge weight. [1] For a directed graph, a similar problem is known as Minimum Bottleneck Spanning Arborescence (MBSA).
English: Treatment induces a bottleneck effect, where only some resistant subclones will survive and propagate to re-form a heterogeneous tumour. Date 27 February 2014, 04:02:36