H-beam sections (typical column sections, due to resistance to bending in all axis) may be driven at angles "raked" to rock or other firmer soils; the H-beams are left extended above the base. A reinforced concrete plug may be placed under the water, a process known as tremie concrete placement. When the caisson is dewatered, this plug acts as ...
A pivot table in BOEMax, a Basis of Estimate software package. To create a BOE companies, throughout the past few decades, have used spreadsheet programs and skilled cost analysts to enter thousands of lines of data and create complex algorithms to calculate the costs. These positions require a high level of skill to ensure accuracy and ...
Pile integrity testing using low-strain tests such as the TDR (Transient Dynamic Response) method, is a rapid way of assessing the continuity and integrity of concrete piled foundations. The test measures: pile length, or depth to anomalies; pile head stiffness; pile shaft mobility, which is dependent on pile section and concrete properties
Casing is a large diameter pipe that is assembled and inserted into a recently drilled section of a borehole. Similar to the bones of a spine protecting the spinal cord, casing is set inside the drilled borehole to protect and support the wellstream. The lower portion (and sometimes the entirety) is typically held in place with cement. [1]
Concrete offshore platforms of the gravity-base type are almost always constructed in their vertical attitude. This allows the inshore installation of deck girders and equipment and the later transport of the whole structure to the installation site. The most common concrete designs are: [citation needed] Condeep (with one, two, three or four ...
Crosshole sonic logging (CSL) is a method to determine the structural integrity of drilled shafts and other concrete piles. The CSL method is considered to be more accurate than sonic echo testing in the determination of structural soundness of concrete within the drilled shaft inside of the rebar cage. This method provides little indication of ...
Also called caissons, drilled shafts, drilled piers, cast-in-drilled-hole piles (CIDH piles) or cast-in-situ piles, a borehole is drilled into the ground, then concrete (and often some sort of reinforcing) is placed into the borehole to form the pile. Rotary boring techniques allow larger diameter piles than any other piling method and permit ...
The weight of the element can be determined by the calculated volume, and using the specific gravity (normal weight reinforced concrete is approximately 24 kN/m3). Establishing the lifting anchor positions will influence the rigging arrangements used and therefore the static analysis of the rigging should be determined.